Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51951
Well Classification: OW Status: PR - 11/21/2023
Well Name/No:Cosslett East #1D-22H-H168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/21/2023
FacilityID:483579LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5183 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1715FNL  1178 FELLat/Long: 40.039231 / -104.984258Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039231 / -104.984257Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/31/2023
End Date: 8/10/2023
Reported: 9/20/2023
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/21/2023             Measured TD: 18478 ft.    Vertical TD: 7860 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/21/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2025
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 460 FNL  1390 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68W Footage: 460 FSL  1390 FWL
Proposed Depth/Form:18458 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: T1N R68W Sec. 22: E/
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 550 ft., Weight: 54.4 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2445 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 815, Top: 0 ft., Bottom: 2445 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18458 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2883, Top: , Bottom: 18458 ft.
Casing:String Type: NEW, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:4/23/2023
Spud Date:3/14/2023Spud Date Is:ACTUAL
Measured TD:18478 ft.Measured PB depth:18455 ft.
True Vertical TD:7860 ft.True Vertical PB depth:7860 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 471 FNL  1341 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68WFootage: 460 FSL  1409 FWL
Log Types:CBL, MWD/LWD, (Resistivity on 123-51944).
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 585 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 918, Top: 0 ft., Bottom: 585 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2521 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 2521 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18455 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2915, Top: 410 ft., Bottom: 18455 ft., Determination Method: CBL
Casing:String Type: NEW, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 145 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 145 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN5145 ft.NN
SUSSEX5797 ft.NN
SHANNON6274 ft.NN
SHARON SPRINGS8227 ft.NN
NIOBRARA8265 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/21/2023                Interval Top: 8789 ft.    Interval Bottom: 18387 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/31/2023Treatment End Date:8/10/2023
Treatment Summary:Frac'd Niobrara with 57 stage plug and perf; 7250820 total lbs proppant pumped: 222763 lbs 40/70 mesh and 7028057 lbs 100 mesh; 315531 total bbls fluid pumped: 291579 bbls gelled fluid, 179 bbls recycled water, 23072 bbls fresh water and 701 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):315531Max pressure during treatment (psi):9006
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:57
Total acid used in treatment (bbls):701Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):179Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):23072Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7250820Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8694 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2023Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 338
BBLS_OIL 515
BTU_GAS 1300
CALC_BBLS_H2O 338
CALC_BBLS_OIL 515
CALC_GOR 2497
CALC_MCF_GAS 1286
CASING_PRESS 2250
GRAVITY_OIL 38
MCF_GAS 1286
TUBING_PRESS 1471
Perforation Data:
Interval Top:8789 ft.# Of Holes:3275
Interval Bottom:18387 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)16405
Total Gas Produced (MCF)205841
GOR12547
GOR DeterminationBOE
Average BOE per Day142.475
Average MCFE per Day826.348

 Federal Financial Assurance  i 

 Tribal Well  i No