Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51943
Well Classification: OW Status: PR - 11/21/2023
Well Name/No:Cosslett East #1M-22H-H168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/21/2023
FacilityID:483571LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5181 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1716FNL  1088 FELLat/Long: 40.039230 / -104.983937Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039229 / -104.983936Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/27/2023
End Date: 9/8/2023
Reported: 10/6/2023
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/21/2023             Measured TD: 19949 ft.    Vertical TD: 7729 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/21/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2025
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 470 FNL  854 FEL
Bottom Hole Location:Sec:26 Twp: 1N 68W Footage: 465 FSL  827 FEL
Proposed Depth/Form:19896 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: T1N R68W Sec. 22: E/
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 550 ft., Weight: 54.4 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2695 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 898, Top: 0 ft., Bottom: 2695 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19896 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3096, Top: , Bottom: 19896 ft.
Casing:String Type: NEW, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:5/29/2023
Spud Date:3/21/2023Spud Date Is:ACTUAL
Measured TD:19949 ft.Measured PB depth:19939 ft.
True Vertical TD:7729 ft.True Vertical PB depth:7729 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 470 FNL  854 FEL
Bottom Hole Location:Sec:26 Twp: 1N 68WFootage: 465 FSL  827 FEL
Log Types:CBL, MWD/LWD, (Resistivity on 123-51944).
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 619 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 619 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2780 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 2780 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19939 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3140, Top: 1455 ft., Bottom: 19939 ft., Determination Method: CBL
Casing:String Type: NEW, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 145 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 145 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN5947 ft.NN
SUSSEX6689 ft.NN
SHANNON7236 ft.NN
SHARON SPRINGS9710 ft.NN
NIOBRARA9768 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/21/2023                Interval Top: 10210 ft.    Interval Bottom: 19870 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/27/2023Treatment End Date:9/8/2023
Treatment Summary:Frac'd Niobrara with 57 stage plug and perf; 7317485 total lbs proppant pumped: 3675639 lbs 40/70 mesh and 3641846 lbs 100 mesh; 331131 total bbls fluid pumped: 298958 bbls gelled fluid, 179 bbls recycled water, 31293 bbls fresh water and 701 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):331131Max pressure during treatment (psi):8888
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:57
Total acid used in treatment (bbls):701Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):179Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):31293Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7317485Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10021 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2023Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 389
BBLS_OIL 569
BTU_GAS 1300
CALC_BBLS_H2O 389
CALC_BBLS_OIL 569
CALC_GOR 2167
CALC_MCF_GAS 1233
CASING_PRESS 2544
GRAVITY_OIL 38
MCF_GAS 1233
TUBING_PRESS 1484
Perforation Data:
Interval Top:10210 ft.# Of Holes:3200
Interval Bottom:19870 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24581
Total Gas Produced (MCF)290148
GOR11803
GOR DeterminationBOE
Average BOE per Day204.792
Average MCFE per Day1187.819

 Federal Financial Assurance  i 

 Tribal Well  i No