|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/5/2026 Measured TD: 1821 ft. Vertical TD: 1821 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/5/2026 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/6/2025 | | Proposed Top PZ Location: | Sec:4 Twp: 3N 67W | Footage: 773 FNL 2180 FWL | | Bottom Hole Location: | Sec:1 Twp: 3N 67W | Footage: 836 FNL 2216 FWL | | Proposed Depth/Form: | 23483 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 4073374 , Unit Acreage: 3440, Drill Unit: T3N-67W;1:NW4;2:N2;3 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 37 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 21570 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2460, Top: , Bottom: 21580 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/6/2023 | | Spud Date: | 10/6/2023 | Spud Date Is: | ACTUAL | | Measured TD: | 1821 ft. | Measured PB depth: | | | True Vertical TD: | 1821 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:4 Twp: 3N 67W | Footage: 773 FNL 2180 FWL | | Bottom Hole Location: | Sec:1 Twp: 3N 67W | Footage: 836 FNL 2216 FWL | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1811 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1811 ft., Determination Method: VISU |
Formation CODL Formation Classification: OW Status: SI - 5/5/2026 Interval Top: 8101 ft. Interval Bottom: 23722 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/15/2024 | Treatment End Date: | 8/6/2024 | | Treatment Summary: | 30 Y007-FB ACID; 43 BBL 7.5% HCL ACID; 16,240 BBL PUMP DOWN; 534,732 BBL SLICKWATER; 551,045 BBL TOTAL FLUID; 10,300,143 LBS WHITE 30/50 GENOA/SAND HILLS; 3,857,620 LBS 40/70 GENOA/SAND HILLS; 547,086 LBS 100 MESH GENOA/SAND HILLS; 1,652,360 LBS 40/140 CAPITAL SAND; 16,357,209 LBS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 551045 | Max pressure during treatment (psi): | 8554 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 38 | | Total acid used in treatment (bbls): | 73 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 40218 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 510754 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 16357209 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8101 ft. | # Of Holes: | 912 | | Interval Bottom: | 23722 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 103028 |
| Total Gas Produced (MCF) | 999899 |
| GOR | 9705 |
| GOR Determination | BOE |
| Average BOE per Day | 758.108 |
| Average MCFE per Day | 4397.010 |
| Federal Financial Assurance | i | |
|
|