|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/15/2023 Measured TD: 23037 ft. Vertical TD: 7226 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/15/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/6/2025 | Proposed Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 1665 FSL 284 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 359 FSL 361 FEL | Proposed Depth/Form: | 23054 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3375 , Unit Acreage: 1600, Drill Unit: T3N-R67W;09:N2,N2S2; | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 23044 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2641, Top: , Bottom: 23044 ft. |
| | |
Wellbore Completed | Completion Date: | 2/2/2023 | Spud Date: | 11/21/2022 | Spud Date Is: | ACTUAL | Measured TD: | 23037 ft. | Measured PB depth: | 22972 ft. | True Vertical TD: | 7226 ft. | True Vertical PB depth: | 7227 ft. | Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 1665 FSL 284 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 359 S 361 E | Log Types: | CBL, MWD/LWD, CNL has been run on the Berry Farms 8-2HZ API 05-123-51858 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1881 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 832, Top: 0 ft., Bottom: 1881 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 23017 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 2535, Top: 1365 ft., Bottom: 23037 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3691 ft. | | | | SUSSEX | 4198 ft. | | | | SHANNON | 4745 ft. | | | | SHARON SPRINGS | 7162 ft. | | | | NIOBRARA | 7216 ft. | | | | CODELL | 7869 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 8/15/2023 Interval Top: 7934 ft. Interval Bottom: 22820 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/20/2023 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 4/29/2023 | Treatment End Date: | 5/20/2023 | Treatment Summary: | 20,304 BBL PUMP DOWN; 511,582 BBL SLICKWATER; 531,886 BBL TOTAL FLUID; 14,737,420 LBS WHITE 30/50 OTTAWA/ST. PETERS; 1,788,310 LBS WHITE 40/70 OTTAWA/ST. PETERS; 16,525,730 LBS TOTAL PROPPANT.
| Total fluid used in treatment (bbls): | 531886 | Max pressure during treatment (psi): | 8353 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 36 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 88.00 | Recycled water used in treatment (bbls): | 6340 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 525546 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 16525730 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7356 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/4/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 136 | BBLS_OIL | 446 | BTU_GAS | 1322 | CALC_BBLS_H2O | 136 | CALC_BBLS_OIL | 446 | CALC_GOR | 3070 | CALC_MCF_GAS | 1369 | CASING_PRESS | 1050 | GRAVITY_OIL | 55 | MCF_GAS | 1369 | TUBING_PRESS | 750 |
| Perforation Data: | Interval Top: | 7934 ft. | # Of Holes: | 888 | Interval Bottom: | 22820 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 69369 |
Total Gas Produced (MCF) | 589811 |
GOR | 8502 |
GOR Determination | BOE |
Average BOE per Day | 467.583 |
Average MCFE per Day | 2711.998 |
Federal Financial Assurance | i | |
|
|