Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51842
Well Classification: OW Status: PR - 5/29/2023
Well Name/No:Ruby West #9R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/29/2023
FacilityID:483041LocationID:482392
County:WELD #123Location:NESW 7 7N65W 6
Field:WATTENBERG - #90750Elevation:4923 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2602FSL  2427 FWLLat/Long: 40.589694 / -104.707111Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.589693 / -104.707112Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/6/2022
End Date: 1/1/2023
Reported: 3/13/2024
Originally Reported: 4/17/2023
Days to report: 437
Days to report: 106
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/29/2023             Measured TD: 17940 ft.    Vertical TD: 7224 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/29/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2025
Proposed Top PZ Location:Sec:12 Twp: 7N 66W Footage: 1691 FSL  470 FEL
Bottom Hole Location:Sec:11 Twp: 7N 66W Footage: 1691 FSL  470 FWL
Proposed Depth/Form:17955 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17955 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2453, Top: 2500 ft., Bottom: 17955 ft.

Wellbore Completed
Completion Date:11/12/2022
Spud Date:11/7/2022Spud Date Is:ACTUAL
Measured TD:17940 ft.Measured PB depth:17826 ft.
True Vertical TD:7224 ft.True Vertical PB depth:7224 ft.
Top PZ Location:Sec:12 Twp: 7N 65WFootage: 1668 FSL  621 FEL
Bottom Hole Location:Sec:11 Twp: 7N 65WFootage: 1699 FSL  480 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-51747
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1563 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 414, Top: 0 ft., Bottom: 1563 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17803 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2715, Top: 650 ft., Bottom: 17803 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4166 ft.NN
SUSSEX4763 ft.NN
SHANNON5626 ft.NN
SHARON SPRINGS7824 ft.NN
NIOBRARA7849 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/29/2023                 Interval Top: 8351 ft.    Interval Bottom: 17568 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/29/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/6/2022Treatment End Date:1/1/2023
Treatment Summary:529,859 bbls total slickwater; 16,581,456 # sand total (200/mesh 1252535 100/mesh 693690 40/70 14635231 30/50); 7987 gals 15% HCL. Method to determine flowback: metering flowback tank volumes.
Total fluid used in treatment (bbls):529859Max pressure during treatment (psi):9017
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:45
Total acid used in treatment (bbls):190Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2287
Fresh water used in treatment (bbls):529669Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16581456Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7870 ft.
Tubing Packer Depth:7870 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/29/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1524
BBLS_OIL 40
BTU_GAS 1384
CALC_BBLS_H2O 1524
CALC_BBLS_OIL 16
CALC_GOR 800
CALC_MCF_GAS 54
GRAVITY_OIL 42
MCF_GAS 32
TUBING_PRESS 2163
Perforation Data:
Interval Top:8351 ft.# Of Holes:1215
Interval Bottom:17568 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)23188
Total Gas Produced (MCF)85119
GOR3670
GOR DeterminationBOE
Average BOE per Day103.794
Average MCFE per Day601.999

 Federal Financial Assurance  i 

 Tribal Well  i No