Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51807
Well Classification: OW Status: PR - 7/12/2024
Well Name/No:Hen #10N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/12/2024
FacilityID:482742LocationID:482393
County:WELD #123Location:SWNE 8 4N64W 6
Field:WATTENBERG - #90750Elevation:4779 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2219FNL  2044 FELLat/Long: 40.328050 / -104.572340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.328040 / -104.572340Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/3/2024
End Date: 5/12/2024
Reported: 6/20/2024
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/12/2024             Measured TD: 14742 ft.    Vertical TD: 6851 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/12/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2025
Proposed Top PZ Location:Sec:8 Twp: 4N 64W Footage: 2278 FNL  2440 FEL
Bottom Hole Location:Sec:9 Twp: 4N 64W Footage: 2277 FNL  200 FEL
Proposed Depth/Form:14785 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3328 , Unit Acreage: 3770, Drill Unit: S.4: S2S2S2, S.5: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14785 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: , Bottom: 14785 ft.

Wellbore Completed
Completion Date:9/5/2023
Spud Date:6/17/2023Spud Date Is:ACTUAL
Measured TD:14742 ft.Measured PB depth:14722 ft.
True Vertical TD:6851 ft.True Vertical PB depth:6851 ft.
Top PZ Location:Sec:8 Twp: 4N 64WFootage: 2287 FNL  2152 FEL
Bottom Hole Location:Sec:9 Twp: 4N 64WFootage: 2277 FNL  355 FEL
Log Types:CBL, MWD (DIL in 05-123-18372)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1712 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 751, Top: 0 ft., Bottom: 1712 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14736 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2292, Top: 1816 ft., Bottom: 14736 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3769 ft.
SUSSEX4407 ft.
SHANNON5138 ft.
SHARON SPRINGS6862 ft.
NIOBRARA7341 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/12/2024                 Interval Top: 7702 ft.    Interval Bottom: 14700 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/11/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/3/2024Treatment End Date:5/12/2024
Treatment Summary:Niobrara completed with 252 bbls 15% HCL, 130,340 bbls slurry, 17,313 bbls recycled water, 7,164,550 lb 40/140 White.
Total fluid used in treatment (bbls):147905Max pressure during treatment (psi):8953
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):252Min frac gradient (psi/ft):0.48
Recycled water used in treatment (bbls):17313Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):130340Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7164550Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7185 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1312
CALC_MCF_GAS 6
CASING_PRESS 2154
GRAVITY_OIL 42
MCF_GAS 6
TUBING_PRESS 271
Perforation Data:
Interval Top:7702 ft.# Of Holes:732
Interval Bottom:14700 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)43143
Total Gas Produced (MCF)268150
GOR6215
GOR DeterminationBOE
Average BOE per Day244.770
Average MCFE per Day1419.658

 Federal Financial Assurance  i 

 Tribal Well  i No