Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51788
Well Classification: OW Status: PR - 7/19/2024
Well Name/No:Hen #22N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/19/2024
FacilityID:482723LocationID:482393
County:WELD #123Location:SWNE 8 4N64W 6
Field:WATTENBERG - #90750Elevation:4777 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2399FNL  2042 FELLat/Long: 40.327550 / -104.572340Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.327550 / -104.572340Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/2/2024
End Date: 6/9/2024
Reported: 7/17/2024
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/19/2024             Measured TD: 15391 ft.    Vertical TD: 6801 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/19/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2025
Proposed Top PZ Location:Sec:8 Twp: 4N 64W Footage: 120 FSL  2440 FEL
Bottom Hole Location:Sec:9 Twp: 4N 64W Footage: 120 FSL  200 FEL
Proposed Depth/Form:15356 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3328 , Unit Acreage: 3770, Drill Unit: S.4: S2S2S2, S.5: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15356 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: , Bottom: 15356 ft.

Wellbore Completed
Completion Date:10/6/2023
Spud Date:6/25/2023Spud Date Is:ACTUAL
Measured TD:15391 ft.Measured PB depth:15368 ft.
True Vertical TD:6801 ft.True Vertical PB depth:6801 ft.
Top PZ Location:Sec:8 Twp: 4N 64WFootage: 169 FSL  2403 FEL
Bottom Hole Location:Sec:9 Twp: 4N 64WFootage: 115 FSL  205 FEL
Log Types:CBL, MWD (DIL in 05-123-18372)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1757 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 1757 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15383 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2402, Top: 2468 ft., Bottom: 15383 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4012 ft.
SUSSEX4725 ft.
SHANNON4758 ft.
SHARON SPRINGS7426 ft.
NIOBRARA7860 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/19/2024                 Interval Top: 7826 ft.    Interval Bottom: 15343 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/18/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/2/2024Treatment End Date:6/9/2024
Treatment Summary:Niobrara completed with 283 bbls 15% HCL, 136,344 bbls slurry, 29,589 bbls recycled water, 7,470,360 lb 40/140 White.
Total fluid used in treatment (bbls):166216Max pressure during treatment (psi):8925
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):283Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):29589Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):136344Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7470360Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7724 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 410
BBLS_OIL 170
BTU_GAS 1312
CALC_BBLS_H2O 410
CALC_BBLS_OIL 170
CALC_GOR 3012
CALC_MCF_GAS 512
CASING_PRESS 142
GRAVITY_OIL 42
MCF_GAS 512
TUBING_PRESS 1122
Perforation Data:
Interval Top:7826 ft.# Of Holes:732
Interval Bottom:15343 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)31207
Total Gas Produced (MCF)228373
GOR7318
GOR DeterminationBOE
Average BOE per Day193.705
Average MCFE per Day1123.498

 Federal Financial Assurance  i 

 Tribal Well  i No