Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51775
Well Classification: OW Status: PR - 11/25/2024
Well Name/No:George #08N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/25/2024
FacilityID:482666LocationID:482391
County:WELD #123Location:SWNE 21 4N64W 6
Field:WATTENBERG - #90750Elevation:4719 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1850FNL  2326 FELLat/Long: 40.300090 / -104.554640Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.300096 / -104.554651Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/30/2024
End Date: 10/8/2024
Reported: 11/20/2024
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/25/2024             Measured TD: 17984 ft.    Vertical TD: 6757 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/25/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/4/2025
Proposed Top PZ Location:Sec:21 Twp: 4N 64W Footage: 1653 FNL  200 FEL
Bottom Hole Location:Sec:20 Twp: 4N 64W Footage: 1654 FNL  200 FWL
Proposed Depth/Form:17878 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3328 , Unit Acreage: 3770, Drill Unit: S.4: S2S2S2, S.5: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17878 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 2000 ft., Bottom: 17878 ft.

Wellbore Completed
Completion Date:3/28/2024
Spud Date:2/29/2024Spud Date Is:ACTUAL
Measured TD:17984 ft.Measured PB depth:17968 ft.
True Vertical TD:6757 ft.True Vertical PB depth:6757 ft.
Top PZ Location:Sec:21 Twp: 4N 64WFootage: 1668 FNL  239 FEL
Bottom Hole Location:Sec:20 Twp: 4N 64WFootage: 1664 FNL  206 FWL
Log Types:CBL, MWD/LWD, (IND in 123-29145, RES in 123-51778)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 794, Top: 0 ft., Bottom: 2000 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17975 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3168, Top: 820 ft., Bottom: 17975 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4013 ft.
SUSSEX4448 ft.
SHANNON5421 ft.
SHARON SPRINGS7405 ft.
NIOBRARA7498 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 3/1/2026                  Interval Top: 7858 ft.    Interval Bottom: 17937 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/19/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:9/30/2024Treatment End Date:10/8/2024
Treatment Summary:Niobrara completed with 243 bbls 28% HCL, 123,091 bbls slurry, 40,391 bbls recycled water, 10,136,718 lb 40/140 Sand.
Total fluid used in treatment (bbls):163725Max pressure during treatment (psi):8323
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):243Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):40391Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):123091Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10136718Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7669 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 362
BBLS_OIL 363
BTU_GAS 1220
CALC_BBLS_H2O 362
CALC_BBLS_OIL 363
CALC_GOR 2882
CALC_MCF_GAS 1046
CASING_PRESS 2726
GRAVITY_OIL 42
MCF_GAS 1046
TUBING_PRESS 1953
Perforation Data:
Interval Top:7858 ft.# Of Holes:900
Interval Bottom:17937 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)69759
Total Gas Produced (MCF)437936
GOR6277
GOR DeterminationBOE
Average BOE per Day399.136
Average MCFE per Day2314.974

 Federal Financial Assurance  i 

 Tribal Well  i No