|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/1/2023 Measured TD: 15580 ft. Vertical TD: 7447 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/7/2025 | Proposed Top PZ Location: | Sec:12 Twp: 7N 66W | Footage: 2300 FNL 470 FEL | Bottom Hole Location: | Sec:11 Twp: 7N 66W | Footage: 2300 FNL 470 FWL | Proposed Depth/Form: | 18048 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18048 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2484, Top: 2500 ft., Bottom: 18048 ft. |
| | |
Wellbore Completed | Completion Date: | 10/5/2022 | Spud Date: | 8/9/2022 | Spud Date Is: | ACTUAL | Measured TD: | 15580 ft. | Measured PB depth: | 15580 ft. | True Vertical TD: | 7447 ft. | True Vertical PB depth: | 7447 ft. | Bottom Hole Location: | Sec:12 Twp: 7N 65W | Footage: 2281 FNL 2923 FWL | Log Types: | MWD/LWD, DIL in API 05-123-51747 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1571 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1571 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 0 ft., Depth: 15580 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: OPEN HOLE , Top: , Depth: 15035 ft., Bottom: , Sacks: , Method: STAGE TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4150 ft. | | N | N | SUSSEX | 4723 ft. | | N | N | SHANNON | 5520 ft. | | N | N | SHARON SPRINGS | 7603 ft. | | N | N | NIOBRARA | 7624 ft. | | N | N | FORT HAYS | 8037 ft. | | N | N | CODELL | 8214 ft. | | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 5/31/2023 Measured TD: 18022 ft. Vertical TD: 7439 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 5/31/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/7/2025 | Proposed Top PZ Location: | Sec:12 Twp: 7N 66W | Footage: 2300 FNL 470 FEL | Bottom Hole Location: | Sec:11 Twp: 7N 66W | Footage: 2275 FNL 470 FWL | Proposed Depth/Form: | 18036 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1571 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1571 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18036 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2484, Top: 2500 ft., Bottom: 18036 ft. |
| | |
Wellbore Completed | Completion Date: | 10/5/2022 | Spud Date: | 9/26/2022 | Spud Date Is: | ACTUAL | Measured TD: | 18022 ft. | Measured PB depth: | 18012 ft. | True Vertical TD: | 7439 ft. | True Vertical PB depth: | 7439 ft. | Top PZ Location: | Sec:12 Twp: 7N 65W | Footage: 2318 FNL 480 FEL | Bottom Hole Location: | Sec:11 Twp: 7N 65W | Footage: 2309 FNL 485 FWL | Log Types: | MWD/LWD, CBL, MUD, DIL in API 05-123-51747 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1571 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1571 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18012 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2885, Top: 620 ft., Bottom: 18012 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4150 ft. | | N | N | SUSSEX | 4723 ft. | | N | N | SHANNON | 5520 ft. | | N | N | SHARON SPRINGS | 7603 ft. | | N | N | NIOBRARA | 7624 ft. | | N | N | FORT HAYS | 8037 ft. | | N | N | CODELL | 8214 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 5/31/2023 Interval Top: 8287 ft. Interval Bottom: 17904 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/31/2023 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/7/2022 | Treatment End Date: | 1/2/2023 | Treatment Summary: | 411,348 bbls total slickwater; 12,935,006 # sand total (200/mesh 882095 100/mesh 448790 40/70 11604121 30/50); 3994 gals 15% HCL. Method used to determine flowback volume: individual separator meters. | Total fluid used in treatment (bbls): | 411348 | Max pressure during treatment (psi): | 8830 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 47 | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.97 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3090 | Fresh water used in treatment (bbls): | 411254 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 12935006 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7784 ft. | Tubing Packer Depth: | 7784 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/31/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1298 | BBLS_OIL | 59 | BTU_GAS | 1384 | CALC_BBLS_H2O | 1298 | CALC_BBLS_OIL | 59 | CALC_GOR | 254 | CALC_MCF_GAS | 15 | GRAVITY_OIL | 42 | MCF_GAS | 15 | TUBING_PRESS | 3090 |
| Perforation Data: | Interval Top: | 8287 ft. | # Of Holes: | 1269 | Interval Bottom: | 17904 ft. | Hole Size: | 0.433 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 36164 |
Total Gas Produced (MCF) | 63909 |
GOR | 1767 |
GOR Determination | BOE |
Average BOE per Day | 128.887 |
Average MCFE per Day | 747.543 |
Federal Financial Assurance | i | |
|
|