Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51621
Well Classification: OW Status: PR - 5/23/2024
Well Name/No:Blehm #6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/23/2024
FacilityID:481125LocationID:481002
County:WELD #123Location:Lot 3 18 7N66W 6
Field:WATTENBERG - #90750Elevation:5079 ft.
Planned Location:2623FSL  1632 FWLLat/Long: 40.574363 / -104.825924Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2022
End Date: 7/14/2022
Reported: 10/13/2022
Days to report: 91
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/23/2024             Measured TD: 17830 ft.    Vertical TD: 7119 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/23/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/5/2024
Proposed Top PZ Location:Sec:13 Twp: 7N 67W Footage: 2310 FNL  160 FEL
Bottom Hole Location:Sec:14 Twp: 7N 67W Footage: 2310 FNL  160 FWL
Proposed Depth/Form:17489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3241 , Unit Acreage: 1280, Drill Unit: 13, 14: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17489 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2391, Top: 2500 ft., Bottom: 17489 ft.

Wellbore Completed
Completion Date:1/30/2022
Spud Date:12/10/2021Spud Date Is:ACTUAL
Measured TD:17830 ft.Measured PB depth:17787 ft.
True Vertical TD:7119 ft.True Vertical PB depth:7119 ft.
Top PZ Location:Sec:13 Twp: 7N 67WFootage: 2312 FNL  126 FEL
Bottom Hole Location:Sec:14 Twp: 7N 67WFootage: 2311 FNL  130 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-37612
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1548 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1548 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17814 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2760, Top: 40 ft., Bottom: 17814 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3922 ft.4479 ft.NN
SUSSEX4479 ft.5105 ft.NN
SHANNON5105 ft.7396 ft.NN
SHARON SPRINGS7396 ft.7419 ft.NN
NIOBRARA7419 ft.17830 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/23/2024                 Interval Top: 7651 ft.    Interval Bottom: 17672 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/24/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/23/2022Treatment End Date:7/14/2022
Treatment Summary:190 bbls 15% HCl; 12,695 bbls Pump Down; 557,848 bbls Treated Water. 1,327,835 lbs 100 Mesh Premium White sand; 16,092,082 lbs 30/50 Premium White sand; 1,937,800 lbs 40/70 Premium White sand. Flowback volume metered.
Total fluid used in treatment (bbls):570733Max pressure during treatment (psi):9062
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:51
Total acid used in treatment (bbls):190Min frac gradient (psi/ft):1.02
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7798
Fresh water used in treatment (bbls):570543Disposition method For flowback:DISPOSAL
Total proppant used (lbs):19357717Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7550 ft.
Tubing Packer Depth:7550 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2022Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1701
BBLS_OIL 27
BTU_GAS 1401
CALC_BBLS_H2O 1701
CALC_BBLS_OIL 27
CALC_GOR 2296
CALC_MCF_GAS 62
CASING_PRESS 9500
GRAVITY_OIL 41
MCF_GAS 62
TUBING_PRESS 2196
Perforation Data:
Interval Top:7651 ft.# Of Holes:1370
Interval Bottom:17672 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)20720
Total Gas Produced (MCF)111301
GOR5371
GOR DeterminationBOE
Average BOE per Day109.320
Average MCFE per Day634.086

 Federal Financial Assurance  i 

 Tribal Well  i No