Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51619
Well Classification: OW Status: PR - 5/28/2024
Well Name/No:Blehm #7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/28/2024
FacilityID:481123LocationID:481002
County:WELD #123Location:Lot 3 18 7N66W 6
Field:WATTENBERG - #90750Elevation:5078 ft.
Planned Location:2616FSL  1656 FWLLat/Long: 40.574344 / -104.825877Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2022
End Date: 7/13/2022
Reported: 10/13/2022
Days to report: 92
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/28/2024             Measured TD: 17885 ft.    Vertical TD: 7217 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/28/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/5/2024
Proposed Top PZ Location:Sec:13 Twp: 7N 67W Footage: 2556 FSL  160 FEL
Bottom Hole Location:Sec:14 Twp: 7N 67W Footage: 2542 FSL  160 FWL
Proposed Depth/Form:17564 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3241 , Unit Acreage: 1280, Drill Unit: 13, 14: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17564 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2404, Top: 2500 ft., Bottom: 17564 ft.

Wellbore Completed
Completion Date:1/25/2022
Spud Date:12/11/2021Spud Date Is:ACTUAL
Measured TD:17885 ft.Measured PB depth:17846 ft.
True Vertical TD:7217 ft.True Vertical PB depth:7217 ft.
Top PZ Location:Sec:13 Twp: 7N 67WFootage: 2571 FSL  114 FEL
Bottom Hole Location:Sec:14 Twp: 7N 67WFootage: 2615 FSL  152 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-37612
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17873 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2760, Top: 100 ft., Bottom: 17873 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3919 ft.4475 ft.NN
SUSSEX4475 ft.5099 ft.NN
SHANNON5099 ft.7369 ft.NN
SHARON SPRINGS7369 ft.7388 ft.NN
NIOBRARA7388 ft.17885 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/28/2024                 Interval Top: 7703 ft.    Interval Bottom: 17725 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/24/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/23/2022Treatment End Date:7/13/2022
Treatment Summary:184 bbls 15% HCl; 12,002 bbls Pump Down; 549,676 bbls FR Water. 1,325,884 lbs 100 Mesh Premium White sand; 15,712,590 lbs 30/50 Premium White sand; 2,044,040 lbs 40/70 Premium White sand. Flowback volume metered.
Total fluid used in treatment (bbls):561862Max pressure during treatment (psi):9176
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:51
Total acid used in treatment (bbls):184Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7724
Fresh water used in treatment (bbls):561678Disposition method For flowback:DISPOSAL
Total proppant used (lbs):19082514Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7598 ft.
Tubing Packer Depth:7598 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2022Test Method:Flowback
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1466
BBLS_OIL 85
BTU_GAS 1401
CALC_BBLS_H2O 1466
CALC_BBLS_OIL 85
CALC_GOR 706
CALC_MCF_GAS 60
CASING_PRESS 9500
GRAVITY_OIL 41
MCF_GAS 60
TUBING_PRESS 2214
Perforation Data:
Interval Top:7703 ft.# Of Holes:1225
Interval Bottom:17725 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)18554
Total Gas Produced (MCF)90463
GOR4875
GOR DeterminationBOE
Average BOE per Day93.431
Average MCFE per Day541.921

 Federal Financial Assurance  i 

 Tribal Well  i No