|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/11/2025 Measured TD: 20722 ft. Vertical TD: 7228 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/11/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/26/2025 | | Proposed Top PZ Location: | Sec:5 Twp: 3N 67W | Footage: 2137 FSL 2050 FEL | | Bottom Hole Location: | Sec:1 Twp: 3N 68W | Footage: 2191 FSL 395 FWL | | Proposed Depth/Form: | 20862 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3298 , Unit Acreage: 880, Drill Unit: T3N-67W; 05: W2SE, S | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20852 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2373, Top: , Bottom: 20852 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/28/2023 | | Spud Date: | 10/17/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 20722 ft. | Measured PB depth: | 20665 ft. | | True Vertical TD: | 7228 ft. | True Vertical PB depth: | 7228 ft. | | Top PZ Location: | Sec:05 Twp: 3N 67W | Footage: 2116 FSL 2015 FEL | | Bottom Hole Location: | Sec:01 Twp: 3N 67W | Footage: 2131 FSL 471 FWL | | Log Types: | CBL, MWD/LWD, resistivity log run on UPV P 05-18D api 05-123-31476 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 71 ft., Weight: 37 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 71 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1849 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 847, Top: 0 ft., Bottom: 1849 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20712 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2144, Top: 0 ft., Bottom: 20722 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3640 ft. | | | | | SUSSEX | 4096 ft. | | | | | SHANNON | 4627 ft. | | | | | SHARON SPRINGS | 6935 ft. | | | | | NIOBRARA | 6983 ft. | | | | | FORT HAYS | 7566 ft. | | | | | CODELL | 8053 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 12/1/2025 Interval Top: 7635 ft. Interval Bottom: 20554 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/15/2023 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/4/2025 | Treatment End Date: | 6/4/2025 | | Treatment Summary: | Treatment Rate 2-15.3 bpm
Surfactant - 582 gals
Acid Package - 3,990 gals
Biocide Package - 79 gals
Chemical Diverter - 850 lbs
Linear Gel - 30 gals
Breaker - 50 lbs
Crosslinker - 5 lbs
Total fluid w/ Water 3590.00 bbl | | Total fluid used in treatment (bbls): | 3590 | Max pressure during treatment (psi): | 3448 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 33 | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 3742 | | Fresh water used in treatment (bbls): | 3495 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/17/2023 | Treatment End Date: | 6/27/2023 | | Treatment Summary: | 24 BBL 15% HCL ACID; 14,178 BBL PUMP DOWN; 453,817 BBL SLICKWATER; 468,019 BBL TOTAL FLUID; 13,796,210 LBS 30/50 NORTHERN WHITE SANDS CORP; 425,960 LBS 40/70 NORTHERN WHITE SANDS CORP; 14,222,170 LBS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 468019 | Max pressure during treatment (psi): | 7872 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 33 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 467995 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 14222170 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 942 | | BBLS_OIL | 1412 | | BTU_GAS | 1350 | | CALC_BBLS_H2O | 942 | | CALC_BBLS_OIL | 1412 | | CALC_GOR | 1866 | | CALC_MCF_GAS | 2635 | | CASING_PRESS | 2436 | | GRAVITY_OIL | 53 | | MCF_GAS | 2635 | | TUBING_PRESS | 926 |
| | Perforation Data: | | Interval Top: | 7635 ft. | # Of Holes: | 786 | | Interval Bottom: | 20554 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 37407 |
| Total Gas Produced (MCF) | 106634 |
| GOR | 2850 |
| GOR Determination | BOE |
| Average BOE per Day | 151.551 |
| Average MCFE per Day | 878.982 |
| Federal Financial Assurance | i | |
|
|