|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/14/2022 Measured TD: 18161 ft. Vertical TD: 7359 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/14/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/18/2022 | | Proposed Top PZ Location: | Sec:1 Twp: 1S 66W | Footage: 460 FNL 968 FEL | | Bottom Hole Location: | Sec:12 Twp: 1S 66W | Footage: 360 FSL 974 FEL | | Proposed Depth/Form: | 17931 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2957 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1824 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1824 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18173 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2266, Top: 0 ft., Bottom: 18173 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/7/2021 | | Spud Date: | 8/18/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 18161 ft. | Measured PB depth: | 18078 ft. | | True Vertical TD: | 7359 ft. | True Vertical PB depth: | 7359 ft. | | Top PZ Location: | Sec:1 Twp: 1S 66W | Footage: 490 FNL 850 FEL | | Bottom Hole Location: | Sec:12 Twp: 1S 66W | Footage: 366 FSL 949 FEL | | Log Types: | MWD/LWD,CBL, RES run on County Line 3112-01H (API 05-123-51171) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1809 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1809 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18161 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2510, Top: 350 ft., Bottom: 18161 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 973 ft. | 1290 ft. | N | N | | PARKMAN | 4850 ft. | | N | N | | SUSSEX | 5238 ft. | | N | N | | SHANNON | 5737 ft. | | N | N | | SHARON SPRINGS | 8010 ft. | | N | N | | NIOBRARA | 8027 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/14/2022 Interval Top: 8743 ft. Interval Bottom: 17982 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/18/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/8/2022 | Treatment End Date: | 7/20/2022 | | Treatment Summary: | FR Water 483,036 bbl, Treated Water 10,806 bbl, Fresh Water 2490 bbl, (20,845,926 gals), 28% HCL 800 bbl.
Proppant:100 Mesh 3,574,280lbs 40/70 white sand 15,421,769 and 200 Mesh 5,100 lbs
Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility
flowback. | | Total fluid used in treatment (bbls): | 497132 | Max pressure during treatment (psi): | 11255 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 46 | | Total acid used in treatment (bbls): | 800 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 40130 | | Fresh water used in treatment (bbls): | 496332 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 19001149 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8148 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/14/2022 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1877 | | BBLS_OIL | 59 | | BTU_GAS | 1516 | | CALC_BBLS_H2O | 1877 | | CALC_BBLS_OIL | 59 | | CALC_GOR | 2932 | | CALC_MCF_GAS | 173 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 41 | | MCF_GAS | 173 |
| | Perforation Data: | | Interval Top: | 8743 ft. | # Of Holes: | 1698 | | Interval Bottom: | 17982 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 24379 |
| Total Gas Produced (MCF) | 130269 |
| GOR | 5343 |
| GOR Determination | BOE |
| Average BOE per Day | 128.118 |
| Average MCFE per Day | 743.088 |
| Federal Financial Assurance | i | |
|
|