Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50742
Well Classification: OW Status: PR - 6/16/2022
Well Name/No:Warner #2E-10H-E165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/16/2022
FacilityID:470992LocationID:470930
County:WELD #123Location:SWNW 10 1N65W 6
Field:WATTENBERG - #90750Elevation:4971 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2203FNL  343 FWLLat/Long: 40.067252 / -104.658284Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.067250 / -104.658283Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/18/2022
End Date: 4/25/2022
Reported: 5/3/2022
Days to report: 8
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/16/2022             Measured TD: 14618 ft.    Vertical TD: 7084 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/16/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/23/2022
Proposed Top PZ Location:Sec:10 Twp: 1N 65W Footage: 2180 FNL  2100 FWL
Bottom Hole Location:Sec:3 Twp: 1N 65W Footage: 460 FNL  2100 FWL
Proposed Depth/Form:14842 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 119, Top: 0 ft., Bottom: 104 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2524 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1301, Top: 0 ft., Bottom: 2524 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14754 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1967, Top: , Bottom: 14754 ft.

Wellbore Completed
Completion Date:3/18/2022
Spud Date:1/17/2022Spud Date Is:ACTUAL
Measured TD:14618 ft.Measured PB depth:14608 ft.
True Vertical TD:7084 ft.True Vertical PB depth:7084 ft.
Top PZ Location:Sec:10 Twp: 1N 65WFootage: 2170 FNL  2081 FWL
Bottom Hole Location:Sec:3 Twp: 1N 65WFootage: 459 FNL  2096 FWL
Log Types:CBL, MWD/LWD, (Resistivity on 123-50736).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2588 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 870, Top: 0 ft., Bottom: 2588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14608 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2350, Top: 0 ft., Bottom: 14605 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4221 ft.NN
SUSSEX4595 ft.NN
SHANNON5140 ft.NN
SHARON SPRINGS7245 ft.NN
NIOBRARA7259 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/16/2022                 Interval Top: 7629 ft.    Interval Bottom: 14515 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/28/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/18/2022Treatment End Date:4/25/2022
Treatment Summary:Frac'd Niobrara with 41 stage plug and perf: 12527491 total pounds proppant pumped: 12326521 pounds 40/70 mesh; 200970 pounds 100 mesh. 394507 total bbls fluid pumped: 381429 bbls gelled fluid; 12590 bbls fresh water and 488 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):394507Max pressure during treatment (psi):9622
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):488Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1093
Fresh water used in treatment (bbls):12590Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12527491Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7427 ft.
Tubing Packer Depth:7425 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/16/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 217
BTU_GAS 1325
CALC_BBLS_H2O 25
CALC_BBLS_OIL 217
CALC_GOR 1037
CALC_MCF_GAS 225
CASING_PRESS 713
GRAVITY_OIL 40
MCF_GAS 225
TUBING_PRESS 1478
Perforation Data:
Interval Top:7629 ft.# Of Holes:1804
Interval Bottom:14515 ft.Hole Size:0.26 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)12060
Total Gas Produced (MCF)166341
GOR13792
GOR DeterminationBOE
Average BOE per Day111.705
Average MCFE per Day647.895

 Federal Financial Assurance  i 

 Tribal Well  i No