Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50630
Well Classification: OW Status: PR - 4/19/2021
Well Name/No:WINDSOCK #21-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/19/2021
FacilityID:469310LocationID:437439
Municipality/County:ERIE / WELD #123Location:SWSE 21 1N68W 6
Field:WATTENBERG - #90750Elevation:5223 ft.
Planned Location:295FSL  2301 FELLat/Long: 40.030177 / -105.007347Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030177 / -105.007347Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/14/2021
End Date: 1/23/2021
Reported: 3/15/2021
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/19/2021             Measured TD: 13881 ft.    Vertical TD: 7857 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/19/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/19/2021
Prop Depth/Form:13983 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13973 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1643, Top: , Bottom: 13973 ft.

Wellbore Completed
Completion Date:1/11/2020
Spud Date:12/10/2019Spud Date Is:ACTUAL
Measured TD:13881 ft.Measured PB depth:13862 ft.
True Vertical TD:7857 ft.True Vertical PB depth:7857 ft.
Top PZ Location:Sec:21 Twp: 1N 68WFootage: 57 FSL  259 FELDepth
Bottom Hole Location:Sec:21 Twp: 1N 68WFootage: 93 FNL  242 FELDepth
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-50633).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1902 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1902 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13871 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1188, Top: 960 ft., Bottom: 13871 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1323 ft.
PARKMAN4893 ft.
SUSSEX6216 ft.
SHARON SPRINGS8157 ft.
NIOBRARA8211 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/19/2021                 Interval Top: 8746 ft.    Interval Bottom: 13838 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/22/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/14/2021Treatment End Date:1/23/2021
Treatment Summary:PERF FROM 8746-13838 19 BBLS 15% HCL ACID; 133 BBLS 20% HCR-7000 WL; 152 BBLS 25% HCR-7000 WL; 76 BBLS 7.5% HCL ACID; 6,198 BBLS PUMP DOWN; 138,750 BBLS SLICKWATER; 145,328 BBLS TOTAL FLUID. 4,105,360 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,105,360 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):145328Max pressure during treatment (psi):7776
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):380Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5505
Fresh water used in treatment (bbls):144948Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4105360Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7478 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 198
BBLS_OIL 117
BTU_GAS 1256
CALC_BBLS_H2O 198
CALC_BBLS_OIL 117
CALC_GOR 2718
CALC_MCF_GAS 318
CASING_PRESS 1200
GRAVITY_OIL 52
MCF_GAS 318
TUBING_PRESS 1800
Perforation Data:
Interval Top:8746 ft.# Of Holes:570
Interval Bottom:13838 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)7883
Total Gas Produced (MCF)43083
GOR5465
GOR DeterminationBOE
Average BOE per Day41.824
Average MCFE per Day242.597

 Federal Financial Assurance  i 

 Tribal Well  i No