Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50519
Well Classification: OW Status: PR - 5/3/2021
Well Name/No:MAE J #8-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2021
FacilityID:467448LocationID:466612
Municipality/County:ERIE / WELD #123Location:SESW 8 1N68W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:866FSL  2418 FWLLat/Long: 40.060629 / -105.028600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.060625 / -105.028601Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2021
End Date: 2/17/2021
Reported: 3/22/2021
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/3/2021             Measured TD: 13443 ft.    Vertical TD: 7607 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/3/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2021
Proposed Top PZ Location:Sec:17 Twp: 1N 68W Footage: 50 FNL  1142 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68W Footage: 49 FSL  1017 FEL
Proposed Depth/Form:13513 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13503 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1585, Top: , Bottom: 13503 ft.

Wellbore Completed
Completion Date:3/4/2020
Spud Date:10/5/2019Spud Date Is:ACTUAL
Measured TD:13443 ft.Measured PB depth:13421 ft.
True Vertical TD:7607 ft.True Vertical PB depth:7605 ft.
Top PZ Location:Sec:17 Twp: 1N 68WFootage: 243 FNL  1102 FEL
Bottom Hole Location:Sec:17 Twp: 1N 68WFootage: 53 FSL  1027 FEL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-50510).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1926 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13433 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1144, Top: 1710 ft., Bottom: 13433 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1079 ft.
PARKMAN4497 ft.
SUSSEX4876 ft.
SHARON SPRINGS7846 ft.
NIOBRARA7945 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/3/2021                  Interval Top: 8469 ft.    Interval Bottom: 13396 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/25/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/12/2021Treatment End Date:2/17/2021
Treatment Summary:PERF FROM 8469-13396 267 BBLS 20% HCR-7000 WL; 81 BBLS 7.5% HCL ACID; 5,990 BBLS PUMP DOWN; 133,179 BBLS SLICKWATER; 139,517 BBLS TOTAL FLUID. 3,972,555 LBS WHITE 40/70 OTTAWA/ST PETERS; 3,972,555 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):139517Max pressure during treatment (psi):8002
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):348Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):1270Total flowback volume recovered (bbls):800
Fresh water used in treatment (bbls):137899Disposition method For flowback:RECYCLE
Total proppant used (lbs):3972555Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7831 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 99
BBLS_OIL 102
BTU_GAS 1258
CALC_BBLS_H2O 99
CALC_BBLS_OIL 102
CALC_GOR 1500
CALC_MCF_GAS 153
CASING_PRESS 2500
GRAVITY_OIL 51
MCF_GAS 153
TUBING_PRESS 2000
Perforation Data:
Interval Top:8469 ft.# Of Holes:540
Interval Bottom:13396 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)9568
Total Gas Produced (MCF)80000
GOR8361
GOR DeterminationBOE
Average BOE per Day64.089
Average MCFE per Day371.722

 Federal Financial Assurance  i 

 Tribal Well  i No