|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/3/2021 Measured TD: 13363 ft. Vertical TD: 7712 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/3/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/11/2021 | | Proposed Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 50 FNL 2101 FEL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 48 FSL 1950 FEL | | Proposed Depth/Form: | 13380 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13370 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1569, Top: , Bottom: 13370 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/10/2020 | | Spud Date: | 10/6/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 13363 ft. | Measured PB depth: | 13339 ft. | | True Vertical TD: | 7712 ft. | True Vertical PB depth: | 7711 ft. | | Top PZ Location: | Sec:17 Twp: 1N 68W | Footage: 158 FNL 2054 FEL | | Bottom Hole Location: | Sec:17 Twp: 1N 68W | Footage: 55 FSL 1966 FEL | | Log Types: | CBL, MWD/LWD. (GR/CNL in API 123-50510). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1876 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 702, Top: 0 ft., Bottom: 1876 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13351 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1128, Top: 1820 ft., Bottom: 13351 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1078 ft. | | | | | PARKMAN | 4288 ft. | | | | | SUSSEX | 4636 ft. | | | | | SHARON SPRINGS | 7591 ft. | | | | | NIOBRARA | 7608 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/3/2021 Interval Top: 8305 ft. Interval Bottom: 13314 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/25/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 2/28/2021 | Treatment End Date: | 3/5/2021 | | Treatment Summary: | PERF FROM 8305-13314
267 BBLS 20% HCR-7000 WL; 76 BBLS 7.5% HCL ACID; 5,487 BBLS PUMP DOWN; 135,249 BBLS SLICKWATER; 141,079 BBLS TOTAL FLUID. 4,038,458 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,038,458 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 141079 | Max pressure during treatment (psi): | 8124 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | 343 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 614 | | Fresh water used in treatment (bbls): | 140736 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4038458 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7639 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/1/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 131 | | BBLS_OIL | 149 | | BTU_GAS | 1258 | | CALC_BBLS_H2O | 131 | | CALC_BBLS_OIL | 149 | | CALC_GOR | 1544 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 51 | | MCF_GAS | 230 | | TUBING_PRESS | 2200 |
| | Perforation Data: | | Interval Top: | 8305 ft. | # Of Holes: | 540 | | Interval Bottom: | 13314 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5235 |
| Total Gas Produced (MCF) | 34753 |
| GOR | 6638 |
| GOR Determination | BOE |
| Average BOE per Day | 30.749 |
| Average MCFE per Day | 178.355 |
| Federal Financial Assurance | i | |
|
|