Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50512
Well Classification: OW Status: PR - 5/3/2021
Well Name/No:MAE J #8-9HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2021
FacilityID:467441LocationID:466612
Municipality/County:ERIE / WELD #123Location:SESW 8 1N68W 6
Field:WATTENBERG - #90750Elevation:5083 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:776FSL  2413 FWLLat/Long: 40.060382 / -105.028602Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.060379 / -105.028604Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/18/2021
End Date: 2/23/2021
Reported: 4/14/2021
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/3/2021             Measured TD: 13958 ft.    Vertical TD: 7722 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/3/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2021
Proposed Top PZ Location:Sec:8 Twp: 1N 68W Footage: 50 FSL  1341 FEL
Bottom Hole Location:Sec:8 Twp: 1N 68W Footage: 50 FNL  1439 FEL
Proposed Depth/Form:13840 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13830 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1625, Top: , Bottom: 13830 ft.

Wellbore Completed
Completion Date:3/25/2020
Spud Date:10/10/2019Spud Date Is:ACTUAL
Measured TD:13958 ft.Measured PB depth:13916 ft.
True Vertical TD:7722 ft.True Vertical PB depth:7720 ft.
Top PZ Location:Sec:17 Twp: 1N 68WFootage: 225 FNL  1315 FEL
Bottom Hole Location:Sec:8 Twp: 1N 68WFootage: 53 FNL  1460 FEL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-50510).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1932 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 722, Top: 0 ft., Bottom: 1932 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13951 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1178, Top: 1870 ft., Bottom: 13951 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1079 ft.
PARKMAN4582 ft.
SUSSEX4976 ft.
SHARON SPRINGS7907 ft.
NIOBRARA7957 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/3/2021                  Interval Top: 8419 ft.    Interval Bottom: 13892 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/25/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/18/2021Treatment End Date:2/23/2021
Treatment Summary:PERF FROM 8419-13892 305 BBLS 20% HCR-7000 WL; 76 BBLS 7.5% HCL ACID; 6,414 BBLS PUMP DOWN; 149,526 BBLS SLICKWATER; 156,321 BBLS TOTAL FLUID. 4,428,261 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,428,261 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):156321Max pressure during treatment (psi):8015
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):381Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):1200Total flowback volume recovered (bbls):569
Fresh water used in treatment (bbls):154740Disposition method For flowback:RECYCLE
Total proppant used (lbs):4428261Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BBLS_OIL 95
BTU_GAS 1258
CALC_BBLS_H2O 73
CALC_BBLS_OIL 95
CALC_GOR 1432
CALC_MCF_GAS 136
CASING_PRESS 2600
GRAVITY_OIL 51
MCF_GAS 136
TUBING_PRESS 1700
Perforation Data:
Interval Top:8419 ft.# Of Holes:600
Interval Bottom:13892 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)10586
Total Gas Produced (MCF)78456
GOR7411
GOR DeterminationBOE
Average BOE per Day66.144
Average MCFE per Day383.622

 Federal Financial Assurance  i 

 Tribal Well  i No