Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50285
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:GP Cody Fed #20E-15-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:466169LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4673 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:682FNL  1305 FELLat/Long: 40.389990 / -104.682510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389987 / -104.682507Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2021
End Date: 2/13/2021
Reported: 3/1/2021
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 14211 ft.    Vertical TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/19/2021
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 331 FNL  1386 FEL
Bottom Hole Location:Sec:22 Twp: 5N 65W Footage: 327 FNL  200 FWL
Proposed Depth/Form:14153 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14153 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1844, Top: , Bottom: 14153 ft.

Wellbore Completed
Completion Date:2/12/2020
Spud Date:1/3/2020Spud Date Is:ACTUAL
Measured TD:14211 ft.Measured PB depth:14139 ft.
True Vertical TD:6954 ft.True Vertical PB depth:6957 ft.
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 363 FNL  1339 FEL
Bottom Hole Location:Sec:22 Twp: 5N 65WFootage: 308 FNL  199 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Dual Induction on 123-24990).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1611 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 1611 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14189 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2288, Top: 1920 ft., Bottom: 14211 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3701 ft.NN
SUSSEX4189 ft.NN
SHANNON4844 ft.NN
SHARON SPRINGS6863 ft.NN
NIOBRARA6890 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 7390 ft.    Interval Bottom: 14092 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/7/2021Treatment End Date:2/13/2021
Treatment Summary:Frac'd Niobrara with 30 stage plug and perf; 73809 total bbls fluid pumped: 63212 bbls gelled fluid, 10545 bbls fresh water, and 52 bbls 28% HCl acid; 6669345 total lbs proppant pumped: 3387640 lbs 40/70 mesh and 3281705 lbs 30/50 mesh.
Total fluid used in treatment (bbls):73809Max pressure during treatment (psi):8329
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):52Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7763
Fresh water used in treatment (bbls):10545Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6669345Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7252 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2021Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 267
BBLS_OIL 444
BTU_GAS 1297
CALC_BBLS_H2O 267
CALC_BBLS_OIL 444
CALC_GOR 6178
CALC_MCF_GAS 2743
CASING_PRESS 2206
GRAVITY_OIL 55
MCF_GAS 2743
TUBING_PRESS 1710
Perforation Data:
Interval Top:7390 ft.# Of Holes:871
Interval Bottom:14092 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5557
Total Gas Produced (MCF)111639
GOR20089
GOR DeterminationMCFE
Average BOE per Day67.905
Average MCFE per Day393.852

 Federal Financial Assurance  i 

 Tribal Well  i No