|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2023 Measured TD: 17880 ft. Vertical TD: 6979 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/30/2021 | | Proposed Top PZ Location: | Sec:12 Twp: 5N 67W | Footage: 345 FSL 150 FEL | | Bottom Hole Location: | Sec:11 Twp: 5N 67W | Footage: 274 FSL 360 FWL | | Proposed Depth/Form: | 17951 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 35, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 531, Top: 0 ft., Bottom: 1750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17951 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2030, Top: , Bottom: 17951 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/24/2019 | | Spud Date: | 7/25/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 17880 ft. | Measured PB depth: | 17758 ft. | | True Vertical TD: | 6979 ft. | True Vertical PB depth: | 6980 ft. | | Top PZ Location: | Sec:12 Twp: 5N 67W | Footage: 341 FSL 103 FEL | | Bottom Hole Location: | Sec:11 Twp: 5N 67W | Footage: 275 FSL 390 FWL | | Log Types: | MWD/LWD, CBL, Mud Log (RES/GR in API: 05-123-50256 & 05-123-50255) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1819 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 1819 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17845 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2372, Top: 0 ft., Bottom: 17880 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3876 ft. | | N | N | | SUSSEX | 4430 ft. | | N | N | | SHANNON | 5505 ft. | | N | N | | SHARON SPRINGS | 7502 ft. | | N | N | | NIOBRARA | 7567 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 2/1/2023 Interval Top: 7970 ft. Interval Bottom: 17692 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/28/2020 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/17/2020 | Treatment End Date: | 5/3/2020 | | Treatment Summary: | 55 Stage Plug and Perf
Total Fluid: 160,267 bbls
Gel Fluid: 93,857 bbls
Slickwater Fluid: 65,731 bbls
15% HCl Acid: 679 bbls
Total Proppant: 10,530,000 lbs
Silica Proppant: 10,530,000 lbs
Method for determining flowback: measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 160267 | Max pressure during treatment (psi): | 4403 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 55 | | Total acid used in treatment (bbls): | 679 | Min frac gradient (psi/ft): | 0.98 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 5676 | | Fresh water used in treatment (bbls): | 159588 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10530000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7543 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/6/2020 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 63 | | BBLS_OIL | 204 | | BTU_GAS | 1334 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 204 | | CALC_GOR | 1725 | | CALC_MCF_GAS | 352 | | CASING_PRESS | 1966 | | GRAVITY_OIL | 52 | | MCF_GAS | 352 | | TUBING_PRESS | 1594 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 1980 | | Interval Bottom: | 17692 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 10396 |
| Total Gas Produced (MCF) | 141217 |
| GOR | 13583 |
| GOR Determination | BOE |
| Average BOE per Day | 95.336 |
| Average MCFE per Day | 552.963 |
| Federal Financial Assurance | i | |
|
|