Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50260
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:Bost Farm #34N-11C-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:465700LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWSW 7 5N66W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4872 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2666FSL  1254 FWLLat/Long: 40.414148 / -104.827862Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.414148 / -104.827863Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/17/2020
End Date: 5/3/2020
Reported: 1/25/2022
Originally Reported: 5/12/2020
Days to report: 632
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 17880 ft.    Vertical TD: 6979 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/30/2021
Proposed Top PZ Location:Sec:12 Twp: 5N 67W Footage: 345 FSL  150 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67W Footage: 274 FSL  360 FWL
Proposed Depth/Form:17951 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17951 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2030, Top: , Bottom: 17951 ft.

Wellbore Completed
Completion Date:10/24/2019
Spud Date:7/25/2019Spud Date Is:ACTUAL
Measured TD:17880 ft.Measured PB depth:17758 ft.
True Vertical TD:6979 ft.True Vertical PB depth:6980 ft.
Top PZ Location:Sec:12 Twp: 5N 67WFootage: 341 FSL  103 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67WFootage: 275 FSL  390 FWL
Log Types:MWD/LWD, CBL, Mud Log (RES/GR in API: 05-123-50256 & 05-123-50255)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1819 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 1819 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17845 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2372, Top: 0 ft., Bottom: 17880 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3876 ft.NN
SUSSEX4430 ft.NN
SHANNON5505 ft.NN
SHARON SPRINGS7502 ft.NN
NIOBRARA7567 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2023                  Interval Top: 7970 ft.    Interval Bottom: 17692 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/28/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/17/2020Treatment End Date:5/3/2020
Treatment Summary:55 Stage Plug and Perf Total Fluid: 160,267 bbls Gel Fluid: 93,857 bbls Slickwater Fluid: 65,731 bbls 15% HCl Acid: 679 bbls Total Proppant: 10,530,000 lbs Silica Proppant: 10,530,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):160267Max pressure during treatment (psi):4403
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:55
Total acid used in treatment (bbls):679Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5676
Fresh water used in treatment (bbls):159588Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10530000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7543 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 63
BBLS_OIL 204
BTU_GAS 1334
CALC_BBLS_H2O 63
CALC_BBLS_OIL 204
CALC_GOR 1725
CALC_MCF_GAS 352
CASING_PRESS 1966
GRAVITY_OIL 52
MCF_GAS 352
TUBING_PRESS 1594
Perforation Data:
Interval Top:7970 ft.# Of Holes:1980
Interval Bottom:17692 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)10396
Total Gas Produced (MCF)141217
GOR13583
GOR DeterminationBOE
Average BOE per Day95.336
Average MCFE per Day552.963

 Federal Financial Assurance  i 

 Tribal Well  i No