Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50256
Well Classification: OW Status: PR - 7/27/2020
Well Name/No:Bost Farm #32C-11-L2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/27/2020
FacilityID:465696LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWSW 7 5N66W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4877 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2666FSL  1074 FWLLat/Long: 40.414151 / -104.828509Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.414151 / -104.828508Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/31/2020
End Date: 4/16/2020
Reported: 1/25/2022
Originally Reported: 4/23/2020
Days to report: 649
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/27/2020             Measured TD: 14411 ft.    Vertical TD: 7128 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/27/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/30/2021
Proposed Top PZ Location:Sec:12 Twp: 5N 67W Footage: 2321 FSL  150 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67W Footage: 2244 FSL  50 FWL
Proposed Depth/Form:17836 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: S 7,8,11,12
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: Sec 7, 8, 11, 12
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: S 7,8,11,12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17836 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2003, Top: , Bottom: 17836 ft.

Wellbore Completed
Completion Date:9/9/2019
Spud Date:7/18/2019Spud Date Is:ACTUAL
Measured TD:14411 ft.Measured PB depth:14277 ft.
True Vertical TD:7128 ft.True Vertical PB depth:7128 ft.
Top PZ Location:Sec:12 Twp: 5N 67WFootage: 2307 FSL  174 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67WFootage: 2308 FSL  3507 FWL
Log Types:MWD/LWD, CBL, Mud Log, RES/GR, (RES/GR also in API:05-123-50255)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1794 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 762, Top: 0 ft., Bottom: 1794 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14360 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1957, Top: 0 ft., Bottom: 14411 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3653 ft.NN
SUSSEX4362 ft.NN
SHANNON4770 ft.NN
SHARON SPRINGS6955 ft.NN
NIOBRARA6998 ft.NN
CODELL14243 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/10/2020                 Interval Top: 8840 ft.    Interval Bottom: 9230 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,840'-9,230'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8840 ft.# Of Holes:1332
Interval Bottom:9230 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/10/2020                 Interval Top: 7983 ft.    Interval Bottom: 14148 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,983'-8,840' 9,230'-14,148
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7983 ft.# Of Holes:1332
Interval Bottom:14148 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/27/2020                 Interval Top: 7645 ft.    Interval Bottom: 14211 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/18/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/31/2020Treatment End Date:4/16/2020
Treatment Summary:37 Stage Plug and Perf Total Fluid: 103, 286 bbls Gel Fluid: 58,095 bbls Slickwater Fluid: 44,727 bbls 15% HCl Acid: 464 bbls Total Proppant: 5,997,000 lbs Silica Proppant: 5,997,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):103286Max pressure during treatment (psi):4323
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):464Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4928
Fresh water used in treatment (bbls):102822Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5997000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7218 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 97
BBLS_OIL 483
BTU_GAS 1334
CALC_BBLS_H2O 97
CALC_BBLS_OIL 483
CALC_GOR 2385
CALC_MCF_GAS 1152
CASING_PRESS 1863
GRAVITY_OIL 52
MCF_GAS 1152
TUBING_PRESS 1585
Perforation Data:
Interval Top:7645 ft.# Of Holes:1332
Interval Bottom:14211 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/10/2020                 Interval Top: 7645 ft.    Interval Bottom: 14211 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/10/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,645'-7,983' 14,148'-14,211'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7645 ft.# Of Holes:1332
Interval Bottom:14211 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5820
Total Gas Produced (MCF)136821
GOR23508
GOR DeterminationMCFE
Average BOE per Day80.626
Average MCFE per Day467.610

 Federal Financial Assurance  i 

 Tribal Well  i No