Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50252
Well Classification: OW Status: PR - 6/7/2020
Well Name/No:Bost Farm #33N-11C-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/7/2020
FacilityID:465692LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWSW 7 5N66W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4874 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2666FSL  1154 FWLLat/Long: 40.414150 / -104.828221Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.414150 / -104.828220Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/31/2020
End Date: 4/16/2020
Reported: 1/25/2022
Originally Reported: 4/23/2020
Days to report: 649
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/7/2020             Measured TD: 17860 ft.    Vertical TD: 6977 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/7/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/30/2021
Proposed Top PZ Location:Sec:12 Twp: 5N 67W Footage: 1440 FSL  150 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67W Footage: 1369 FSL  50 FWL
Proposed Depth/Form:17817 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2705 , Unit Acreage: 2564, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17817 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2000, Top: , Bottom: 17817 ft.

Wellbore Completed
Completion Date:10/2/2019
Spud Date:7/21/2019Spud Date Is:ACTUAL
Measured TD:17860 ft.Measured PB depth:17736 ft.
True Vertical TD:6977 ft.True Vertical PB depth:6977 ft.
Top PZ Location:Sec:12 Twp: 5N 67WFootage: 1435 FSL  171 FEL
Bottom Hole Location:Sec:11 Twp: 5N 67WFootage: 1364 FSL  62 FWL
Log Types:MWD/LWD, CBL, Mud Log (RES/GR in API: 05-123-50256 & 05-123-50255)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1790 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 652, Top: 0 ft., Bottom: 1790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17824 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2352, Top: 0 ft., Bottom: 17860 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3740 ft.NN
SUSSEX4442 ft.NN
SHANNON4853 ft.NN
SHARON SPRINGS7157 ft.NN
NIOBRARA7219 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/7/2020                  Interval Top: 7670 ft.    Interval Bottom: 17670 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/8/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/31/2020Treatment End Date:4/16/2020
Treatment Summary:56 Stage Plug and Perf Total Fluid: 166,932 bbls Slickwater Fluid: 70,670 bbls Gel Fluid: 95,571 bbls 15% HCl Acid: 691 bbls Total Proppant: 10,726,000 lbs Silica Proppant: 10,726,000 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):166932Max pressure during treatment (psi):4305
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):691Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2994
Fresh water used in treatment (bbls):166241Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10726000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7220 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/7/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 295
BTU_GAS 1334
CALC_BBLS_H2O 102
CALC_BBLS_OIL 295
CALC_GOR 1512
CALC_MCF_GAS 446
CASING_PRESS 2053
GRAVITY_OIL 52
MCF_GAS 446
TUBING_PRESS 1695
Perforation Data:
Interval Top:7670 ft.# Of Holes:1908
Interval Bottom:17670 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4249
Total Gas Produced (MCF)147929
GOR34815
GOR DeterminationMCFE
Average BOE per Day81.580
Average MCFE per Day473.144

 Federal Financial Assurance  i 

 Tribal Well  i No