|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2022 Measured TD: 16311 ft. Vertical TD: 6054 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/28/2024 | Prop Depth/Form: | 16429 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: 535-1178 , Unit Acreage: 1280, Drill Unit: 1: ALL, 12: ALL | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1178 , Unit Acreage: 1280, Drill Unit: 1: ALL, 12: ALL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1850 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16429 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1860, Top: 2500 ft., Bottom: 16429 ft. |
| | |
Wellbore Completed | Completion Date: | 8/7/2022 | Spud Date: | 7/22/2022 | Spud Date Is: | ACTUAL | Measured TD: | 16311 ft. | Measured PB depth: | 15772 ft. | True Vertical TD: | 6054 ft. | True Vertical PB depth: | 6057 ft. | Top PZ Location: | Sec:12 Twp: 7N 59W | Footage: 608 FSL 1330 FWL | Depth | Bottom Hole Location: | Sec:1 Twp: 7N 59W | Footage: 241 FNL 1318 FWL | Depth | Log Types: | CBL, MUD, MWD/LWD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1841 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 601, Top: 0 ft., Bottom: 1841 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16242 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2696, Top: 2444 ft., Bottom: 16242 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3289 ft. | | | | SUSSEX | 4066 ft. | | | | SHANNON | 5151 ft. | | | | SHARON SPRINGS | 5924 ft. | | | | NIOBRARA | 6029 ft. | | | | FORT HAYS | 6523 ft. | | | |
Formation N-COM Formation Classification: OW Status: PR - 10/1/2022 Completed Information for Formation NOT COMPLETED | 1st Production Date: | 7/1/2022 | Choke Size: | | Formation Name: | NOT COMPLETED | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation N-COM. |
| No Perforation Data was found for formation N-COM. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 26529 |
Total Gas Produced (MCF) | 26680 |
GOR | 1005 |
GOR Determination | BOE |
Average BOE per Day | 85.095 |
Average MCFE per Day | 493.550 |
Federal Financial Assurance | i | |
|
|