Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50190
Well Classification: OW Status: PR - 5/10/2021
Well Name/No:FARLEY #23-6HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/10/2021
FacilityID:464996LocationID:336228
County:WELD #123Location:SWSW 23 3N66W 6
Field:WATTENBERG - #90750Elevation:4940 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:696FSL  504 FWLLat/Long: 40.205371 / -104.751982Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.205370 / -104.751982Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/6/2021
End Date: 3/9/2021
Reported: 4/22/2021
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/10/2021             Measured TD: 13399 ft.    Vertical TD: 7189 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/10/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/4/2021
Proposed Top PZ Location:Sec:23 Twp: 3N 66W Footage: 300 FSL  2266 FWL
Bottom Hole Location:Sec:26 Twp: 3N 66W Footage: 50 FSL  2253 FWL
Proposed Depth/Form:13457 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13447 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1578, Top: , Bottom: 13447 ft.

Wellbore Completed
Completion Date:10/13/2019
Spud Date:8/5/2019Spud Date Is:ACTUAL
Measured TD:13399 ft.Measured PB depth:13387 ft.
True Vertical TD:7189 ft.True Vertical PB depth:7189 ft.
Top PZ Location:Sec:23 Twp: 3N 66WFootage: 228 FSL  2270 FWL
Bottom Hole Location:Sec:26 Twp: 3N 66WFootage: 51 FSL  2249 FWL
Log Types:CBL, MWD/LWD, GR/OHL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1923 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 0 ft., Bottom: 1923 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13388 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1230, Top: 2070 ft., Bottom: 13388 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1180 ft.
PARKMAN4457 ft.
SUSSEX4653 ft.
SHARON SPRINGS7552 ft.
NIOBRARA7695 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/10/2021                 Interval Top: 7933 ft.    Interval Bottom: 13363 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/6/2021Treatment End Date:3/9/2021
Treatment Summary:PERF FROM 7933-13363 305 BBLS 20% HCR-7000 WL; 76 BBLS 7.5% HCL ACID; 5,445 BBLS PUMP DOWN; 121,003 BBLS SLICKWATER; 126,829 BBLS TOTAL FLUID. 4,363,497 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,363,497 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):126829Max pressure during treatment (psi):7774
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):381Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):1060Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):125388Disposition method For flowback:RECYCLE
Total proppant used (lbs):4363497Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7375 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 82
BBLS_OIL 331
BTU_GAS 1238
CALC_BBLS_H2O 82
CALC_BBLS_OIL 331
CALC_GOR 3695
CALC_MCF_GAS 1223
CASING_PRESS 2400
GRAVITY_OIL 48
MCF_GAS 1223
TUBING_PRESS 2000
Perforation Data:
Interval Top:7933 ft.# Of Holes:600
Interval Bottom:13363 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)10748
Total Gas Produced (MCF)126459
GOR11765
GOR DeterminationBOE
Average BOE per Day89.133
Average MCFE per Day516.973

 Federal Financial Assurance  i 

 Tribal Well  i No