Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50076
Well Classification: OW Status: PR - 4/28/2021
Well Name/No:SARCHET #21-4HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/28/2021
FacilityID:463779LocationID:463773
County:WELD #123Location:SWSW 21 3N66W 6
Field:WATTENBERG - #90750Elevation:4982 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:595FSL  340 FWLLat/Long: 40.204785 / -104.790393Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.204785 / -104.790393Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/18/2021
End Date: 2/23/2021
Reported: 4/14/2021
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/28/2021             Measured TD: 18385 ft.    Vertical TD: 7348 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/28/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/3/2021
Proposed Top PZ Location:Sec:28 Twp: 3N 66W Footage: 184 FNL  1115 FWL
Bottom Hole Location:Sec:16 Twp: 3N 66W Footage: 55 FNL  1248 FWL
Proposed Depth/Form:18322 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18312 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2173, Top: , Bottom: 18312 ft.

Wellbore Completed
Completion Date:9/7/2019
Spud Date:7/3/2019Spud Date Is:ACTUAL
Measured TD:18385 ft.Measured PB depth:18358 ft.
True Vertical TD:7348 ft.True Vertical PB depth:7347 ft.
Top PZ Location:Sec:28 Twp: 3N 66WFootage: 184 FNL  1115 FWL
Bottom Hole Location:Sec:16 Twp: 3N 66WFootage: 55 FNL  1248 FWL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-50074).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1864 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 697, Top: 0 ft., Bottom: 1864 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18372 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1750, Top: 1190 ft., Bottom: 18372 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1130 ft.
PARKMAN4456 ft.
SUSSEX4614 ft.
SHARON SPRINGS7388 ft.
NIOBRARA7482 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/28/2021                 Interval Top: 7714 ft.    Interval Bottom: 18342 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/18/2021Treatment End Date:2/23/2021
Treatment Summary:PERF FROM 7714-18342 48 BBLS 15% HCL ACID; 667 BBLS 20% HCR-7000 WL; 57 BBLS 7.5% HCL ACID; 16,841 BBLS PUMP DOWN; 231,415 BBLS SLICKWATER; 249,028 BBLS TOTAL FLUID. 8,488,286 LBS WHITE 40/70 OTTAWA/ST. PETERS; 8,488,286 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):249028Max pressure during treatment (psi):7912
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):772Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1614
Fresh water used in treatment (bbls):248256Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8488286Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7476 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/16/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 49
BBLS_OIL 325
BTU_GAS 59
CALC_BBLS_H2O 49
CALC_BBLS_OIL 325
CALC_GOR 4855
CALC_MCF_GAS 1578
CASING_PRESS 2800
GRAVITY_OIL 1283
MCF_GAS 1578
TUBING_PRESS 2500
Perforation Data:
Interval Top:7714 ft.# Of Holes:1170
Interval Bottom:18342 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)13297
Total Gas Produced (MCF)224731
GOR16900
GOR DeterminationMCFE
Average BOE per Day142.557
Average MCFE per Day826.794

 Federal Financial Assurance  i 

 Tribal Well  i No