Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49839
Well Classification: OW Status: PR - 10/1/2023
Well Name/No:Peggy Fed #2501-02H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:OG-109089
Facility Status:PRStatus Date10/1/2023
FacilityID:462874LocationID:462872
County:WELD #123Location:SESW 25 9N60W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4893 ft.
Planned Location:300FSL  2432 FWLLat/Long: 40.714774 / -104.040770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.714776 / -104.040769Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/14/2019
End Date: 5/18/2019
Reported: 5/29/2019
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2023             Measured TD: 11888 ft.    Vertical TD: 6376 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:3/1/2021
Prop Depth/Form:11866 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-785 , Unit Acreage: 1920, Drill Unit: Sec 12,1,36:ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 407, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11866 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1572, Top: 0 ft., Bottom: 11866 ft.

Wellbore Completed
Completion Date:4/25/2019
Spud Date:4/2/2019Spud Date Is:ACTUAL
Measured TD:11888 ft.Measured PB depth:11750 ft.
True Vertical TD:6376 ft.True Vertical PB depth:6378 ft.
Top PZ Location:Sec:36 Twp: 9N 60WFootage: 306 FNL  648 FWLDepth
Bottom Hole Location:Sec:36 Twp: 9N 60WFootage: 305 FSL  592 FWLDepth
Log Types:MWD/LWD, CBL, (RES in 05-123-49840)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1610 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 1610 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11874 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1319, Top: 1508 ft., Bottom: 11874 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE327 ft.NN
PARKMAN3519 ft.NN
SUSSEX4494 ft.NN
SHANNON4999 ft.NN
SHARON SPRINGS6354 ft.NN
NIOBRARA6431 ft.NN
CODELL6994 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  PR - 10/1/2023                 Interval Top: 7124 ft.    Interval Bottom: 11715 ft.

 Completed Information for Formation CODELL
1st Production Date:8/28/2019Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/14/2019Treatment End Date:5/18/2019
Treatment Summary:Fresh water 183,603 bbl, Treated water 6,186 bbl, 7.5% HCL 1,073 bbls, 100 mesh 2,356,520 lbs, 40/70 white sand 4,566,360 lbs Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):190862Max pressure during treatment (psi):10768
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):1073Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):19037
Fresh water used in treatment (bbls):189789Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6922880Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:6693 ft.
Tubing Packer Depth:6701 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 140
BBLS_OIL 297
BTU_GAS 1372
CALC_BBLS_H2O 140
CALC_BBLS_OIL 297
CALC_GOR 310
CALC_MCF_GAS 92
GRAVITY_OIL 35
MCF_GAS 92
TUBING_PRESS 653
Perforation Data:
Interval Top:7124 ft.# Of Holes:720
Interval Bottom:11715 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)7916
Total Gas Produced (MCF)11444
GOR1445
GOR DeterminationBOE
Average BOE per Day27.000
Average MCFE per Day156.615

 Federal Financial Assurance  i 

 Tribal Well  i No