|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/11/2020 Measured TD: 17105 ft. Vertical TD: 7055 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/11/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 2/12/2021 | Proposed Top PZ Location: | Sec:5 Twp: 1N 64W | Footage: 1419 FSL 515 FWL | Bottom Hole Location: | Sec:4 Twp: 1N 64W | Footage: 1386 FSL 403 FEL | Proposed Depth/Form: | 16981 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2097 , Unit Acreage: 1280, Drill Unit: Sec. 4 & 5: ALL | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 587, Top: 0 ft., Bottom: 1200 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7274 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 734, Top: , Bottom: 7274 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6521 ft., Depth: 16981 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 696, Top: 6521 ft., Bottom: 16981 ft. |
| | |
Wellbore Completed | Completion Date: | 11/26/2019 | Spud Date: | 10/31/2019 | Spud Date Is: | ACTUAL | Measured TD: | 17105 ft. | Measured PB depth: | 17084 ft. | True Vertical TD: | 7055 ft. | True Vertical PB depth: | 7055 ft. | Top PZ Location: | Sec:5 Twp: 1N 64W | Footage: 1419 FSL 515 FWL | Bottom Hole Location: | Sec:4 Twp: 1N 64W | Footage: 1386 S 403 E | Log Types: | MWD/LWD, CBL, Resistivity. | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 84 , Citings Type: ACTUAL | Cement: | Sacks: 78, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1261 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: 1261 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7397 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 385, Top: 1260 ft., Bottom: 7397 ft., Determination Method: CALC | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17098 ft., Weight: 13.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 905, Top: 4450 ft., Bottom: 17098 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4160 ft. | 4464 ft. | N | N | SUSSEX | 4720 ft. | 4904 ft. | N | N | SHANNON | 5293 ft. | 5536 ft. | N | N | SHARON SPRINGS | 6690 ft. | | N | N | NIOBRARA | 6953 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 5/11/2020 Interval Top: 7446 ft. Interval Bottom: 17009 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/7/2020 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 2/14/2020 | Treatment End Date: | 3/14/2020 | Treatment Summary: | 120 stage frac: 304,722 bbls Slickwater , 273 bbl 15% HCl Acid, 1,207,350 lb 100 mesh, and 7,274,665 lb of 30/50 white sand used in treatment | Total fluid used in treatment (bbls): | 304995 | Max pressure during treatment (psi): | 14913 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 120 | Total acid used in treatment (bbls): | 273 | Min frac gradient (psi/ft): | 0.93 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 25498 | Fresh water used in treatment (bbls): | 304722 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 8482015 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7131 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/11/2020 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 429 | BBLS_OIL | 229 | BTU_GAS | 1557 | CALC_BBLS_H2O | 429 | CALC_BBLS_OIL | 229 | CALC_GOR | 1017 | CALC_MCF_GAS | 233 | CASING_PRESS | 143 | GRAVITY_OIL | 36 | MCF_GAS | 233 | TUBING_PRESS | 1060 |
| Perforation Data: | Interval Top: | 7446 ft. | # Of Holes: | 2880 | Interval Bottom: | 17009 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 7760 |
Total Gas Produced (MCF) | 16050 |
GOR | 2068 |
GOR Determination | BOE |
Average BOE per Day | 28.808 |
Average MCFE per Day | 167.056 |
Federal Financial Assurance | i | |
|
|