|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2024 Measured TD: 17239 ft. Vertical TD: 7023 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 2/12/2021 | Proposed Top PZ Location: | Sec:5 Twp: 1N 64W | Footage: 964 FNL 495 FWL | Bottom Hole Location: | Sec:4 Twp: 1N 64W | Footage: 938 FNL 402 FEL | Proposed Depth/Form: | 17032 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2097 , Unit Acreage: 1280, Drill Unit: Sec. 4 & 5: ALL | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 730, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7333 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 740, Top: , Bottom: 7333 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6600 ft., Depth: 17032 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 694, Top: 6600 ft., Bottom: 17032 ft. |
| | |
Wellbore Completed | Completion Date: | 1/26/2020 | Spud Date: | 12/15/2019 | Spud Date Is: | ACTUAL | Measured TD: | 17239 ft. | Measured PB depth: | 17218 ft. | True Vertical TD: | 7023 ft. | True Vertical PB depth: | 7022 ft. | Top PZ Location: | Sec:5 Twp: 1N 64W | Footage: 964 FNL 495 FWL | Bottom Hole Location: | Sec:4 Twp: 1N 64W | Footage: 938 N 402 E | Log Types: | CBL, MWD/LWD, (Resistivity on 123-49716). | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 84 , Citings Type: ACTUAL | Cement: | Sacks: 79, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1555 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 0 ft., Bottom: 1555 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7536 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 2006 ft., Bottom: 7536 ft., Determination Method: CALC | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 17232 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 910, Top: 5208 ft., Bottom: 17232 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4201 ft. | | N | N | SUSSEX | 4734 ft. | | N | N | SHANNON | 5628 ft. | | N | N | SHARON SPRINGS | 6688 ft. | | N | N | NIOBRARA | 7020 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 6/1/2024 Interval Top: 7570 ft. Interval Bottom: 17144 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/1/2020 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 3/15/2020 | Treatment End Date: | 4/9/2020 | Treatment Summary: | 120 STAGE WET SHOE PLUG AND PERF 7,985,227 LBS 30/50 WHITE SAND, 1,287,255 LBS 100# MESH, 1,308 BBLS 15% HCL ACID, AND 292,307 BBLS SLICKWATER | Total fluid used in treatment (bbls): | 293615 | Max pressure during treatment (psi): | 8387 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 120 | Total acid used in treatment (bbls): | 1308 | Min frac gradient (psi/ft): | 1.02 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 437 | Fresh water used in treatment (bbls): | 292307 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9272482 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7158 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/17/2020 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 683 | BBLS_OIL | 673 | BTU_GAS | 1399 | CALC_BBLS_H2O | 683 | CALC_BBLS_OIL | 673 | CALC_GOR | 749 | CALC_MCF_GAS | 504 | CASING_PRESS | 300 | GRAVITY_OIL | 36 | MCF_GAS | 504 | TUBING_PRESS | 602 |
| Perforation Data: | Interval Top: | 7570 ft. | # Of Holes: | 2880 | Interval Bottom: | 17144 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 6535 |
Total Gas Produced (MCF) | 20010 |
GOR | 3061 |
GOR Determination | BOE |
Average BOE per Day | 27.113 |
Average MCFE per Day | 157.254 |
Federal Financial Assurance | i | |
|
|