Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49661
Well Classification: OW Status: PR - 8/15/2024
Well Name/No:Canvasback Fed #32-33-1HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CIVITAS NORTH LLC - 10661
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2024
FacilityID:461823LocationID:461821
County:WELD #123Location:SWNW 32 9N60W 6
Field:WILDCAT - #99999Elevation:4943 ft.
Planned Location:1798FNL  647 FWLLat/Long: 40.707938 / -104.123792Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/11/2023
End Date: 9/30/2023
Reported: 11/17/2023
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/15/2024             Measured TD: 16993 ft.    Vertical TD: 6307 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/15/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:12/17/2022
Prop Depth/Form:17049 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-1307 , Unit Acreage: 1280, Drill Unit: 32,33: All
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1307 , Unit Acreage: 1280, Drill Unit: 32, 33: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1874 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 1874 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17049 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2400, Top: 1750 ft., Bottom: 17049 ft.

Wellbore Completed
Completion Date:7/9/2023
Spud Date:10/10/2022Spud Date Is:ACTUAL
Measured TD:16993 ft.Measured PB depth:16980 ft.
True Vertical TD:6307 ft.True Vertical PB depth:6307 ft.
Top PZ Location:Sec:33 Twp: 9N 60WFootage: 328 FNL  300 FELDepth
Bottom Hole Location:Sec:32 Twp: 9N 60WFootage: 379 FNL  340 FWLDepth
Log Types:NO LOGS TO UPLOAD
Log Types:CBL, MWD/LWD, (Resistivity on 123-49655).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 37 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1934 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1934 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16980 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2235, Top: 0 ft., Bottom: 16980 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3692 ft.NN
SUSSEX4408 ft.NN
SHANNON4877 ft.NN
SHARON SPRINGS6495 ft.NN
NIOBRARA6549 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/18/2023                Interval Top: 6954 ft.    Interval Bottom: 16899 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:9/11/2023Treatment End Date:9/30/2023
Treatment Summary:Frac'd Niobrara with 51 stage plug and perf: 18373576 total pounds proppant pumped: 9448199 pounds 40/70 mesh; 8925377 pounds 100 mesh; 589935 total bbls fluid pumped: 571404 bbls gelled fluid; 17913 bbls fresh water and 618 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):589935Max pressure during treatment (psi):8965
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:51
Total acid used in treatment (bbls):618Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):17913Disposition method For flowback:DISPOSAL
Total proppant used (lbs):18373576Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6686 ft.
Tubing Packer Depth:6684 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2023Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 505
BBLS_OIL 129
BTU_GAS 1310
CALC_BBLS_H2O 505
CALC_BBLS_OIL 129
CALC_GOR 659
CALC_MCF_GAS 85
CASING_PRESS 440
GRAVITY_OIL 39
MCF_GAS 85
TUBING_PRESS 641
Perforation Data:
Interval Top:6954 ft.# Of Holes:2040
Interval Bottom:16899 ft.Hole Size:0.36 in.

Formation N-COM                   Formation Classification:                     Status:  PR - 4/25/2024

 Completed Information for Formation NOT COMPLETED
1st Production Date:2/1/2024Choke Size: 
Formation Name:NOT COMPLETEDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation N-COM.
No Perforation Data was found for formation N-COM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)66631
Total Gas Produced (MCF)105662
GOR1585
GOR DeterminationBOE
Average BOE per Day232.367
Average MCFE per Day1347.739

 Federal Financial Assurance  i 

 Tribal Well  i No