Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49610
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:STARS FEDERAL #LD17-770
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC76992
Facility Status:PRStatus Date8/1/2024
FacilityID:461597LocationID:461589
County:WELD #123Location:SWSW 5 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4834 ft.
Planned Location:285FSL  1128 FWLLat/Long: 40.773810 / -103.893750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.773810 / -103.893756Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2019
End Date: 8/23/2019
Reported: 9/19/2019
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 16619 ft.    Vertical TD: 5897 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/31/2021
Prop Depth/Form:16587 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-912 , Unit Acreage: 2560, Drill Unit: Sec 7, 8, 17, 18:ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 144, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16587 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1788, Top: , Bottom: 16587 ft.

Wellbore Completed
Completion Date:6/30/2019
Spud Date:6/18/2019Spud Date Is:ACTUAL
Measured TD:16619 ft.Measured PB depth:16555 ft.
True Vertical TD:5897 ft.True Vertical PB depth:5898 ft.
Top PZ Location:Sec:8 Twp: 9N 58WFootage: 203 FNL  1337 FWLDepth
Bottom Hole Location:Sec:17 Twp: 9N 58WFootage: 145 FSL  1315 FWLDepth
Log Types:CBL, MWD/LWD, (Resistivity in 123-49608)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1884 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 1929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16602 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1677, Top: 3356 ft., Bottom: 16619 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3372 ft.
SUSSEX3971 ft.
TEEPEE BUTTES5130 ft.
SHARON SPRINGS5805 ft.
NIOBRARA5838 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 6327 ft.    Interval Bottom: 16471 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2019Treatment End Date:8/23/2019
Treatment Summary:Niobrara completed with 1023 bbls 28% HCL, 458,657 bbls slurry, 2,654,778 lb 100 Mesh, 19,196,644 lb 40/70
Total fluid used in treatment (bbls):459680Max pressure during treatment (psi):7910
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):1023Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):458657Disposition method For flowback:DISPOSAL
Total proppant used (lbs):21851422Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6131 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/16/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1084
BBLS_OIL 45
BTU_GAS 1321
CALC_BBLS_H2O 1084
CALC_BBLS_OIL 45
CALC_GOR 844
CALC_MCF_GAS 38
CASING_PRESS 13
GRAVITY_OIL 42
MCF_GAS 38
TUBING_PRESS 574
Perforation Data:
Interval Top:6327 ft.# Of Holes:1890
Interval Bottom:16471 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)23651
Total Gas Produced (MCF)82597
GOR3492
GOR DeterminationBOE
Average BOE per Day103.554
Average MCFE per Day600.628

 Federal Financial Assurance  i 

 Tribal Well  i No