Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49603
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:STARS FEDERAL #LD17-760
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC76992
Facility Status:PRStatus Date8/1/2024
FacilityID:461588LocationID:461589
County:WELD #123Location:SWSW 5 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4834 ft.
Planned Location:285FSL  1166 FWLLat/Long: 40.773810 / -103.893610Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.773817 / -103.893621Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2019
End Date: 8/13/2019
Reported: 9/17/2019
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 11988 ft.    Vertical TD: 5903 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/31/2021
Prop Depth/Form:11914 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-912 , Unit Acreage: 2560, Drill Unit: Sec 7, 8, 17, 18:ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 144, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11914 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1237, Top: , Bottom: 11914 ft.

Wellbore Completed
Completion Date:7/3/2019
Spud Date:6/18/2019Spud Date Is:ACTUAL
Measured TD:11988 ft.Measured PB depth:11921 ft.
True Vertical TD:5903 ft.True Vertical PB depth:5903 ft.
Top PZ Location:Sec:8 Twp: 9N 58WFootage: 209 FNL  1973 FWLDepth
Bottom Hole Location:Sec:17 Twp: 9N 58WFootage: 456 FNL  2010 FWLDepth
Log Types:CBL, MWD/LWD, (Resistivity in 123-49608)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1918 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 643, Top: 0 ft., Bottom: 1918 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11968 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1156, Top: 2504 ft., Bottom: 11988 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3404 ft.
SUSSEX4013 ft.
TEEPEE BUTTES5196 ft.
SHARON SPRINGS5888 ft.
NIOBRARA5925 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 6419 ft.    Interval Bottom: 11832 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/3/2019Treatment End Date:8/13/2019
Treatment Summary:Niobrara completed with 80 bbls 28% HCL, 224,043 bbls slurry, 796,806 lb 100 Mesh, 7,648,642 lb 40/70
Total fluid used in treatment (bbls):224123Max pressure during treatment (psi):8138
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):80Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):224043Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8445448Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6289 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/16/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 706
BBLS_OIL 130
BTU_GAS 1370
CALC_BBLS_H2O 706
CALC_BBLS_OIL 130
CALC_GOR 485
CALC_MCF_GAS 63
GRAVITY_OIL 42
MCF_GAS 63
TUBING_PRESS 542
Perforation Data:
Interval Top:6419 ft.# Of Holes:900
Interval Bottom:11832 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)13629
Total Gas Produced (MCF)42280
GOR3102
GOR DeterminationBOE
Average BOE per Day57.144
Average MCFE per Day331.464

 Federal Financial Assurance  i 

 Tribal Well  i No