|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/11/2020 Measured TD: 15195 ft. Vertical TD: 7231 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/11/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/10/2021 | | Proposed Top PZ Location: | Sec:18 Twp: 2N 67W | Footage: 2128 FNL 363 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 14 FNL 370 FEL | | Proposed Depth/Form: | 15227 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED | | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2363 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 910, Top: 0 ft., Bottom: 2363 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15227 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2115, Top: , Bottom: 15227 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/18/2019 | | Spud Date: | 5/10/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 15195 ft. | Measured PB depth: | 15168 ft. | | True Vertical TD: | 7231 ft. | True Vertical PB depth: | 7231 ft. | | Top PZ Location: | Sec:18 Twp: 2N 67W | Footage: 2128 FNL 363 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 14 FNL 370 FEL | | Log Types: | MUD, MWD/LWD, CBL (DIL in 123-15282) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 122 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 55, Top: 0 ft., Bottom: 122 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2405 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 1099, Top: 0 ft., Bottom: 2405 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15183 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2052, Top: 1259 ft., Bottom: 15195 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4433 ft. | | N | N | | SHANNON | 4931 ft. | | N | N | | TEEPEE BUTTES | 6344 ft. | | N | N | | SHARON SPRINGS | 7308 ft. | | N | N | | NIOBRARA | 7573 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/11/2020 Interval Top: 7718 ft. Interval Bottom: 15158 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/1/2020 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/17/2019 | Treatment End Date: | 10/27/2019 | | Treatment Summary: | 287944 bbls of water, 275 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 12 bbl HCL in a 35 stage frac with 6058995 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 288231 | Max pressure during treatment (psi): | 8249 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 35 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 4595 | | Fresh water used in treatment (bbls): | 288219 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6058995 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7309 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/11/2020 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 97 | | BBLS_OIL | 462 | | BTU_GAS | 1262 | | CALC_BBLS_H2O | 97 | | CALC_BBLS_OIL | 462 | | CALC_GOR | 1665 | | CALC_MCF_GAS | 769 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 43 | | MCF_GAS | 769 | | TUBING_PRESS | 1650 |
| | Perforation Data: | | Interval Top: | 7718 ft. | # Of Holes: | 824 | | Interval Bottom: | 15158 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3892 |
| Total Gas Produced (MCF) | 114704 |
| GOR | 29471 |
| GOR Determination | MCFE |
| Average BOE per Day | 65.025 |
| Average MCFE per Day | 377.140 |
| Federal Financial Assurance | i | |
|
|