Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49485
Well Classification: OW Status: PR - 1/11/2020
Well Name/No:Kugel #1K-18H-H267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2020
FacilityID:460644LocationID:336435
Municipality/County:FIRESTONE / WELD #123Location:SENE 18 2N67W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2218FNL  682 FELLat/Long: 40.139551 / -104.926457Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139551 / -104.926458Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/17/2019
End Date: 10/27/2019
Reported: 1/17/2020
Days to report: 82
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2020             Measured TD: 15195 ft.    Vertical TD: 7231 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2021
Proposed Top PZ Location:Sec:18 Twp: 2N 67W Footage: 2128 FNL  363 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67W Footage: 14 FNL  370 FEL
Proposed Depth/Form:15227 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2363 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 910, Top: 0 ft., Bottom: 2363 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15227 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2115, Top: , Bottom: 15227 ft.

Wellbore Completed
Completion Date:7/18/2019
Spud Date:5/10/2019Spud Date Is:ACTUAL
Measured TD:15195 ft.Measured PB depth:15168 ft.
True Vertical TD:7231 ft.True Vertical PB depth:7231 ft.
Top PZ Location:Sec:18 Twp: 2N 67WFootage: 2128 FNL  363 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67WFootage: 14 FNL  370 FEL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-15282)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 122 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 122 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2405 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1099, Top: 0 ft., Bottom: 2405 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15183 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2052, Top: 1259 ft., Bottom: 15195 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4433 ft.NN
SHANNON4931 ft.NN
TEEPEE BUTTES6344 ft.NN
SHARON SPRINGS7308 ft.NN
NIOBRARA7573 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/11/2020                 Interval Top: 7718 ft.    Interval Bottom: 15158 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/17/2019Treatment End Date:10/27/2019
Treatment Summary:287944 bbls of water, 275 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 12 bbl HCL in a 35 stage frac with 6058995 lbs of silica quartz proppant
Total fluid used in treatment (bbls):288231Max pressure during treatment (psi):8249
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4595
Fresh water used in treatment (bbls):288219Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6058995Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7309 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 97
BBLS_OIL 462
BTU_GAS 1262
CALC_BBLS_H2O 97
CALC_BBLS_OIL 462
CALC_GOR 1665
CALC_MCF_GAS 769
CASING_PRESS 2500
GRAVITY_OIL 43
MCF_GAS 769
TUBING_PRESS 1650
Perforation Data:
Interval Top:7718 ft.# Of Holes:824
Interval Bottom:15158 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)3892
Total Gas Produced (MCF)114704
GOR29471
GOR DeterminationMCFE
Average BOE per Day65.025
Average MCFE per Day377.140

 Federal Financial Assurance  i 

 Tribal Well  i No