Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49484
Well Classification: OW Status: PR - 1/11/2020
Well Name/No:Kugel #1L-18H-H267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2020
FacilityID:460643LocationID:336435
Municipality/County:FIRESTONE / WELD #123Location:SENE 18 2N67W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2228FNL  682 FELLat/Long: 40.139523 / -104.926457Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139522 / -104.926457Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2019
End Date: 10/15/2019
Reported: 12/11/2019
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2020             Measured TD: 13732 ft.    Vertical TD: 7482 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2021
Proposed Top PZ Location:Sec:7 Twp: 2N 67W Footage: 253 FSL  7 FEL
Bottom Hole Location:Sec:17 Twp: 2N 67W Footage: 466 FSL  1 FWL
Proposed Depth/Form:13894 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2525 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 968, Top: 0 ft., Bottom: 2525 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13894 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1913, Top: , Bottom: 13894 ft.

Wellbore Completed
Completion Date:7/12/2019
Spud Date:5/9/2019Spud Date Is:ACTUAL
Measured TD:13732 ft.Measured PB depth:13702 ft.
True Vertical TD:7482 ft.True Vertical PB depth:7482 ft.
Top PZ Location:Sec:7 Twp: 2N 67WFootage: 253 FSL  7 FEL
Bottom Hole Location:Sec:17 Twp: 2N 67WFootage: 466 FSL  1 FWL
Log Types:MUD, MWD/LWD, CBL (DIL in API 123-15282)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 122 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 122 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2540 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 0 ft., Bottom: 2540 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13717 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1866, Top: 2171 ft., Bottom: 13732 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4838 ft.NN
SHANNON5446 ft.NN
TEEPEE BUTTES7048 ft.NN
SHARON SPRINGS7954 ft.NN
NIOBRARA8061 ft.NN
FORT HAYS8563 ft.NN
CODELL8692 ft.NN
CARLILE11157 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/11/2020                 Interval Top: 11157 ft.    Interval Bottom: 11701 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/1/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2019Treatment End Date:10/15/2019
Treatment Summary:Fairport: 11157-11701
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11157 ft.# Of Holes:408
Interval Bottom:11701 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/11/2020                 Interval Top: 8692 ft.    Interval Bottom: 13692 ft.

 Completed Information for Formation CODELL
1st Production Date:2/1/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2019Treatment End Date:10/15/2019
Treatment Summary:Codell: 8692-11156, 11702-13692
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8692 ft.# Of Holes:408
Interval Bottom:13692 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/11/2020                 Interval Top: 8661 ft.    Interval Bottom: 13692 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/1/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2019Treatment End Date:10/15/2019
Treatment Summary:119080 bbls of water, 118 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 6 bbl HCL in a 18 stage frac with 2660956 lbs of silica quartz proppant
Total fluid used in treatment (bbls):119204Max pressure during treatment (psi):8257
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4751
Fresh water used in treatment (bbls):119198Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2660956Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 108
BBLS_OIL 376
BTU_GAS 1254
CALC_BBLS_H2O 108
CALC_BBLS_OIL 376
CALC_GOR 1636
CALC_MCF_GAS 615
CASING_PRESS 2800
GRAVITY_OIL 43
MCF_GAS 615
TUBING_PRESS 1425
Perforation Data:
Interval Top:8661 ft.# Of Holes:408
Interval Bottom:13692 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/11/2020                 Interval Top: 8661 ft.    Interval Bottom: 8691 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/1/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2019Treatment End Date:10/15/2019
Treatment Summary:Ft Hays: 8661-8691
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8661 ft.# Of Holes:408
Interval Bottom:8691 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)3063
Total Gas Produced (MCF)90816
GOR29649
GOR DeterminationMCFE
Average BOE per Day51.376
Average MCFE per Day297.998

 Federal Financial Assurance  i 

 Tribal Well  i No