Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49483
Well Classification: OW Status: PR - 1/11/2020
Well Name/No:Kugel #1J-18H-H267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2020
FacilityID:460642LocationID:336435
Municipality/County:FIRESTONE / WELD #123Location:SENE 18 2N67W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2208FNL  682 FELLat/Long: 40.139578 / -104.926457Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139577 / -104.926457Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/17/2019
End Date: 10/26/2019
Reported: 1/17/2020
Days to report: 83
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2020             Measured TD: 15252 ft.    Vertical TD: 7305 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2021
Proposed Top PZ Location:Sec:18 Twp: 2N 67W Footage: 2129 FNL  619 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67W Footage: 16 FNL  611 FEL
Proposed Depth/Form:15324 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2362 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 910, Top: 0 ft., Bottom: 2362 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15324 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2130, Top: , Bottom: 15324 ft.

Wellbore Completed
Completion Date:7/23/2019
Spud Date:5/11/2019Spud Date Is:ACTUAL
Measured TD:15252 ft.Measured PB depth:15237 ft.
True Vertical TD:7305 ft.True Vertical PB depth:7305 ft.
Top PZ Location:Sec:18 Twp: 2N 67WFootage: 2129 FNL  619 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67WFootage: 16 FNL  611 FEL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-15282)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 122 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 122 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2414 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1084, Top: 0 ft., Bottom: 2414 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15239 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1945, Top: 746 ft., Bottom: 15252 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4416 ft.NN
SHANNON4914 ft.NN
TEEPEE BUTTES6405 ft.NN
SHARON SPRINGS7263 ft.NN
NIOBRARA7441 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/11/2020                 Interval Top: 7769 ft.    Interval Bottom: 15215 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/17/2019Treatment End Date:10/26/2019
Treatment Summary:288386 bbls of water, 279 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 18 bbl HCL in a 34 stage frac with 6086010 lbs of silica quartz proppant
Total fluid used in treatment (bbls):288683Max pressure during treatment (psi):8341
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:34
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4446
Fresh water used in treatment (bbls):288665Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6086010Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7351 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 52
BBLS_OIL 365
BTU_GAS 1272
CALC_BBLS_H2O 52
CALC_BBLS_OIL 365
CALC_GOR 1058
CALC_MCF_GAS 386
CASING_PRESS 2600
GRAVITY_OIL 43
MCF_GAS 386
TUBING_PRESS 1700
Perforation Data:
Interval Top:7769 ft.# Of Holes:800
Interval Bottom:15215 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)2319
Total Gas Produced (MCF)107441
GOR46330
GOR DeterminationMCFE
Average BOE per Day57.227
Average MCFE per Day331.929

 Federal Financial Assurance  i 

 Tribal Well  i No