Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49481
Well Classification: OW Status: PR - 1/11/2020
Well Name/No:Kugel #1M-18H-H267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2020
FacilityID:460640LocationID:336435
Municipality/County:FIRESTONE / WELD #123Location:SENE 18 2N67W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2238FNL  682 FELLat/Long: 40.139496 / -104.926457Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139495 / -104.926457Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/10/2019
End Date: 10/15/2019
Reported: 12/11/2019
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2020             Measured TD: 13665 ft.    Vertical TD: 7340 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/10/2021
Proposed Top PZ Location:Sec:8 Twp: 2N 67W Footage: 611 FSL  31 FEL
Bottom Hole Location:Sec:17 Twp: 2N 67W Footage: 465 FSL  60 FWL
Proposed Depth/Form:13775 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2358 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 908, Top: 0 ft., Bottom: 2358 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13775 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1895, Top: , Bottom: 13775 ft.

Wellbore Completed
Completion Date:7/7/2019
Spud Date:5/8/2019Spud Date Is:ACTUAL
Measured TD:13665 ft.Measured PB depth:13636 ft.
True Vertical TD:7340 ft.True Vertical PB depth:7340 ft.
Top PZ Location:Sec:8 Twp: 2N 67WFootage: 611 FSL  31 FEL
Bottom Hole Location:Sec:17 Twp: 2N 67WFootage: 465 FSL  60 FWL
Log Types:MUD, MWD/LWD, CBL (DIL in API 123-15282)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 122 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 122 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2377 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 0 ft., Bottom: 2377 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13650 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1850, Top: 548 ft., Bottom: 13665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4890 ft.NN
SHANNON5516 ft.NN
TEEPEE BUTTES7254 ft.NN
SHARON SPRINGS8036 ft.NN
NIOBRARA8184 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/11/2020                 Interval Top: 8215 ft.    Interval Bottom: 13626 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/10/2019Treatment End Date:10/15/2019
Treatment Summary:216384 bbls of water, 232 bbls of additives (FRP-4CS, ACI-97, ASF-67, SAFE-BFH-2, XLS-3Z, BHL-68, LGA-3J) and 18 bbl HCL in a 26 stage frac with 4417585 lbs of silica quartz proppant
Total fluid used in treatment (bbls):216634Max pressure during treatment (psi):8437
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2570
Fresh water used in treatment (bbls):216616Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4417585Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8218 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 78
BBLS_OIL 446
BTU_GAS 1270
CALC_BBLS_H2O 78
CALC_BBLS_OIL 446
CALC_GOR 1267
CALC_MCF_GAS 565
CASING_PRESS 2600
GRAVITY_OIL 43
MCF_GAS 565
TUBING_PRESS 1700
Perforation Data:
Interval Top:8215 ft.# Of Holes:608
Interval Bottom:13626 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)4169
Total Gas Produced (MCF)89329
GOR21426
GOR DeterminationMCFE
Average BOE per Day53.705
Average MCFE per Day311.463

 Federal Financial Assurance  i 

 Tribal Well  i No