Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49351
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:STRIPES FEDERAL #LD18-740
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC76992
Facility Status:PRStatus Date8/1/2024
FacilityID:460409LocationID:460410
County:WELD #123Location:NENW 7 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4843 ft.
Planned Location:325FNL  2283 FELLat/Long: 40.772060 / -103.908900Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.772072 / -103.908911Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/8/2019
End Date: 9/22/2019
Reported: 10/17/2019
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 12132 ft.    Vertical TD: 5903 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/27/2020
Prop Depth/Form:12170 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-912 , Unit Acreage: 2560, Drill Unit: Sec 7, 8, 17, 18:ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 144, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12170 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1274, Top: , Bottom: 12170 ft.

Wellbore Completed
Completion Date:8/3/2019
Spud Date:7/30/2019Spud Date Is:ACTUAL
Measured TD:12132 ft.Measured PB depth:12070 ft.
True Vertical TD:5903 ft.True Vertical PB depth:5903 ft.
Top PZ Location:Sec:7 Twp: 9N 58WFootage: 359 FNL  1988 FELDepth
Bottom Hole Location:Sec:18 Twp: 9N 58WFootage: 460 FNL  2008 FELDepth
Log Types:CBL, MWD/LWD, Resistivity
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1948 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 648, Top: 0 ft., Bottom: 1948 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12118 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1184, Top: 2576 ft., Bottom: 12132 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3446 ft.
SUSSEX4170 ft.
TEEPEE BUTTES5353 ft.
SHARON SPRINGS6079 ft.
NIOBRARA6117 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 6736 ft.    Interval Bottom: 11981 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/25/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/8/2019Treatment End Date:9/22/2019
Treatment Summary:Niobrara completed with 100 bbls 28% HCl, 235,984 bbls slurry, 889,919 lb 100 Mesh, 8,159,227 lb 40/70
Total fluid used in treatment (bbls):236084Max pressure during treatment (psi):8195
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):100Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):235984Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9049146Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6414 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/20/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 509
BBLS_OIL 367
BTU_GAS 1350
CALC_BBLS_H2O 509
CALC_BBLS_OIL 367
CALC_GOR 523
CALC_MCF_GAS 192
CASING_PRESS 988
GRAVITY_OIL 42
MCF_GAS 192
TUBING_PRESS 509
Perforation Data:
Interval Top:6736 ft.# Of Holes:528
Interval Bottom:11981 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)11454
Total Gas Produced (MCF)36562
GOR3192
GOR DeterminationBOE
Average BOE per Day48.527
Average MCFE per Day281.466

 Federal Financial Assurance  i 

 Tribal Well  i No