Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49235
Well Classification: OW Status: PR - 12/18/2019
Well Name/No:MAB #15-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/18/2019
FacilityID:460178LocationID:460006
County:WELD #123Location:SWSE 15 1N66W 6
Field:WATTENBERG - #90750Elevation:5113 ft.
Planned Location:653FSL  2171 FELLat/Long: 40.045805 / -104.761649Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045805 / -104.761649Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/10/2019
End Date: 9/20/2019
Reported: 11/13/2019
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/18/2019             Measured TD: 18911 ft.    Vertical TD: 7684 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/18/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/20/2020
Proposed Top PZ Location:Sec:15 Twp: 1N 66W Footage: 670 FSL  1863 FEL
Bottom Hole Location:Sec:27 Twp: 1N 66W Footage: 470 FSL  1890 FEL
Proposed Depth/Form:18873 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18863 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2240, Top: , Bottom: 18863 ft.

Wellbore Completed
Completion Date:5/16/2019
Spud Date:1/9/2019Spud Date Is:ACTUAL
Measured TD:18911 ft.Measured PB depth:18866 ft.
True Vertical TD:7684 ft.True Vertical PB depth:7685 ft.
Top PZ Location:Sec:15 Twp: 1N 66WFootage: 677 FSL  1850 FEL
Bottom Hole Location:Sec:27 Twp: 1N 66WFootage: 470 S  1872 E
Log Types:CBL, MWD/LWD. (GR/RES in API 123-49251).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1869 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1876 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18901 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1810, Top: 740 ft., Bottom: 18911 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1701 ft.
PARKMAN4514 ft.
SUSSEX4910 ft.
SHARON SPRINGS7366 ft.
NIOBRARA7388 ft.
FORT HAYS7950 ft.
CODELL8031 ft.
CARLILE10178 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/23/2019                Interval Top: 10578 ft.    Interval Bottom: 18863 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/23/2019Treatment End Date:N/A
Treatment Summary:10578-10943, 12929-13008, 13964-13965, 14970-15046, 18644-18863
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10578 ft.# Of Holes:648
Interval Bottom:18863 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/23/2019                Interval Top: 10451 ft.    Interval Bottom: 10578 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/23/2019Treatment End Date:N/A
Treatment Summary:10451-10578
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10451 ft.# Of Holes:648
Interval Bottom:10578 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/23/2019                Interval Top: 10202 ft.    Interval Bottom: 10451 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/23/2019Treatment End Date:N/A
Treatment Summary:10202-10309, 10361-10451
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10202 ft.# Of Holes:648
Interval Bottom:10451 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/23/2019                Interval Top: 8111 ft.    Interval Bottom: 18644 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/23/2019Treatment End Date:N/A
Treatment Summary:8111-10202, 10309-10361, 10943-12929, 13008-13964, 13965-14970, 15046-18644
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8111 ft.# Of Holes:648
Interval Bottom:18644 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 12/18/2019                Interval Top: 8111 ft.    Interval Bottom: 18863 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:11/9/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/10/2019Treatment End Date:9/20/2019
Treatment Summary:PERF FROM 8111-18863 347 BBLS 15% HCL ACID, 10,909 BBLS PUMP DOWN, 191,347 BBLS SLICKWATER, 202,603 BBLS TOTAL FLUID. 5,931,480 LBS WHITE 40/70 OTTAWA/ST. PETERS, 5,931,480 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):202603Max pressure during treatment (psi):7687
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):347Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):2880Total flowback volume recovered (bbls):1495
Fresh water used in treatment (bbls):199376Disposition method For flowback:RECYCLE
Total proppant used (lbs):5931480Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7664 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 44
BBLS_OIL 128
BTU_GAS 1280
CALC_BBLS_H2O 44
CALC_BBLS_OIL 128
CALC_GOR 1523
CALC_MCF_GAS 195
CASING_PRESS 1250
GRAVITY_OIL 48
MCF_GAS 195
TUBING_PRESS 1600
Perforation Data:
Interval Top:8111 ft.# Of Holes:648
Interval Bottom:18863 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)7381
Total Gas Produced (MCF)153931
GOR20855
GOR DeterminationMCFE
Average BOE per Day92.655
Average MCFE per Day537.387

 Federal Financial Assurance  i 

 Tribal Well  i No