Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49221
Well Classification: OW Status: PR - 11/2/2019
Well Name/No:JDB #15-2HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/2/2019
FacilityID:460161LocationID:460006
County:WELD #123Location:SESE 15 1N66W 6
Field:WATTENBERG - #90750Elevation:5156 ft.
Planned Location:611FSL  1094 FELLat/Long: 40.045685 / -104.757805Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045685 / -104.757805Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/2/2019
End Date: 9/9/2019
Reported: 10/22/2019
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/2/2019             Measured TD: 13610 ft.    Vertical TD: 7505 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/2/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:14 Twp: 1N 66W Footage: 270 FSL  379 FWL
Bottom Hole Location:Sec:23 Twp: 1N 66W Footage: 50 FSL  374 FWL
Proposed Depth/Form:13606 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13596 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1597, Top: , Bottom: 13596 ft.

Wellbore Completed
Completion Date:6/11/2019
Spud Date:3/5/2019Spud Date Is:ACTUAL
Measured TD:13610 ft.Measured PB depth:13590 ft.
True Vertical TD:7505 ft.True Vertical PB depth:7505 ft.
Top PZ Location:Sec:14 Twp: 1N 66WFootage: 281 FSL  366 FWL
Bottom Hole Location:Sec:23 Twp: 1N 66WFootage: 52 S  387 W
Log Types:CBL, MWD/LWD. (GR/RES in API 123-49223).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1920 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 714, Top: 0 ft., Bottom: 1920 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13600 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 950 ft., Bottom: 13610 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1757 ft.
PARKMAN4720 ft.
SUSSEX5128 ft.
SHARON SPRINGS7621 ft.
NIOBRARA7651 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/2/2019                 Interval Top: 8098 ft.    Interval Bottom: 13572 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/24/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2019Treatment End Date:9/9/2019
Treatment Summary:PERF 8098-13572 368 BBLS 15% HCL ACID, 6,267 BBLS PUMP DOWN, 348,697 BBLS SLICKWATER, 355,332 BBLS TOTAL FLUID. 8,156,960 LBS WHITE 40/70 OTTAWA/ST. PETERS, 8,156,960 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):355332Max pressure during treatment (psi):8085
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):368Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):3865Total flowback volume recovered (bbls):9799
Fresh water used in treatment (bbls):351099Disposition method For flowback:RECYCLE
Total proppant used (lbs):8156960Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7682 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/2/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 145
BBLS_OIL 177
BTU_GAS 1280
CALC_BBLS_H2O 145
CALC_BBLS_OIL 177
CALC_GOR 1068
CALC_MCF_GAS 189
CASING_PRESS 2400
GRAVITY_OIL 48
MCF_GAS 189
TUBING_PRESS 1600
Perforation Data:
Interval Top:8098 ft.# Of Holes:672
Interval Bottom:13572 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)3800
Total Gas Produced (MCF)54143
GOR14248
GOR DeterminationBOE
Average BOE per Day35.980
Average MCFE per Day208.689

 Federal Financial Assurance  i 

 Tribal Well  i No