Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48951
Well Classification: OW Status: PR - 1/11/2022
Well Name/No:Guttersen #D09-755
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2022
FacilityID:459563LocationID:459550
County:WELD #123Location:SESW 33 4N64W 6
Field:WATTENBERG - #90750Elevation:4724 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:467FSL  1539 FWLLat/Long: 40.263020 / -104.559850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.263025 / -104.559851Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2021
End Date: 12/12/2021
Reported: 1/24/2022
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2022             Measured TD: 17362 ft.    Vertical TD: 6751 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/28/2024
Proposed Top PZ Location:Sec:4 Twp: 3N 64W Footage: 200 FNL  2350 FWL
Bottom Hole Location:Sec:9 Twp: 3N 64W Footage: 200 FSL  2306 FWL
Proposed Depth/Form:17339 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 663, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17339 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1906, Top: , Bottom: 17339 ft.

Wellbore Completed
Completion Date:12/13/2020
Spud Date:11/25/2020Spud Date Is:ACTUAL
Measured TD:17362 ft.Measured PB depth:17307 ft.
True Vertical TD:6751 ft.True Vertical PB depth:6751 ft.
Top PZ Location:Sec:4 Twp: 3N 64WFootage: 207 FNL  2343 FWL
Bottom Hole Location:Sec:9 Twp: 3N 64WFootage: 200 FSL  2344 FWL
Log Types:CBL, MWD/LWD, Neutron, (IND 05-123-13155)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 1929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17351 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2014, Top: 586 ft., Bottom: 17351 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3681 ft.
SUSSEX4099 ft.
SHANNON4915 ft.
TEEPEE BUTTES5968 ft.
SHARON SPRINGS6720 ft.
NIOBRARA6796 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/11/2022                 Interval Top: 7190 ft.    Interval Bottom: 17222 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/8/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/19/2021Treatment End Date:12/12/2021
Treatment Summary:Niobrara completed with 188 bbls 28% HCL, 582,245 bbls slurry, 31,352 bbls recycled water, 1,504,877 lb 100 mesh, 16,312,055 lb 40/70.
Total fluid used in treatment (bbls):613785Max pressure during treatment (psi):8084
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):188Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):31352Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):582245Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17816932Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6991 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1553
BBLS_OIL 80
BTU_GAS 1285
CALC_BBLS_H2O 1553
CALC_BBLS_OIL 80
CALC_GOR 5088
CALC_MCF_GAS 407
CASING_PRESS 2906
GRAVITY_OIL 42
MCF_GAS 407
TUBING_PRESS 1747
Perforation Data:
Interval Top:7190 ft.# Of Holes:1328
Interval Bottom:17222 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)28507
Total Gas Produced (MCF)312461
GOR10960
GOR DeterminationBOE
Average BOE per Day225.730
Average MCFE per Day1309.215

 Federal Financial Assurance  i 

 Tribal Well  i No