Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48951
Well Classification: OW Status: PR - 1/11/2022
Well Name/No:Guttersen #D09-755
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/11/2022
FacilityID:459563LocationID:459550
County:WELD #123Location:SESW 33 4N64W 6
Field:WATTENBERG - #90750Elevation:4724 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:467FSL  1539 FWLLat/Long: 40.263020 / -104.559850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.263025 / -104.559851Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2021
End Date: 12/12/2021
Reported: 1/24/2022
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/11/2022             Measured TD: 17362 ft.    Vertical TD: 6751 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/28/2024
Proposed Top PZ Location:Sec:4 Twp: 3N 64W Footage: 207 FNL  2343 FWL
Bottom Hole Location:Sec:9 Twp: 3N 64W Footage: 200 FSL  2344 FWL
Proposed Depth/Form:17339 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 663, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17339 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1906, Top: , Bottom: 17339 ft.

Wellbore Completed
Completion Date:12/13/2020
Spud Date:11/25/2020Spud Date Is:ACTUAL
Measured TD:17362 ft.Measured PB depth:17307 ft.
True Vertical TD:6751 ft.True Vertical PB depth:6751 ft.
Top PZ Location:Sec:4 Twp: 3N 64WFootage: 207 FNL  2343 FWL
Bottom Hole Location:Sec:9 Twp: 3N 64WFootage: 200 FSL  2344 FWL
Log Types:CBL, MWD/LWD, Neutron, (IND 05-123-13155)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 1929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17351 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2014, Top: 586 ft., Bottom: 17351 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3681 ft.
SUSSEX4099 ft.
SHANNON4915 ft.
TEEPEE BUTTES5968 ft.
SHARON SPRINGS6720 ft.
NIOBRARA6796 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/11/2022                 Interval Top: 7190 ft.    Interval Bottom: 17222 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/8/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/19/2021Treatment End Date:12/12/2021
Treatment Summary:Niobrara completed with 188 bbls 28% HCL, 582,245 bbls slurry, 31,352 bbls recycled water, 1,504,877 lb 100 mesh, 16,312,055 lb 40/70.
Total fluid used in treatment (bbls):613785Max pressure during treatment (psi):8084
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):188Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):31352Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):582245Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17816932Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6991 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1553
BBLS_OIL 80
BTU_GAS 1285
CALC_BBLS_H2O 1553
CALC_BBLS_OIL 80
CALC_GOR 5088
CALC_MCF_GAS 407
CASING_PRESS 2906
GRAVITY_OIL 42
MCF_GAS 407
TUBING_PRESS 1747
Perforation Data:
Interval Top:7190 ft.# Of Holes:1328
Interval Bottom:17222 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)25730
Total Gas Produced (MCF)312998
GOR12164
GOR DeterminationBOE
Average BOE per Day218.458
Average MCFE per Day1267.017

 Federal Financial Assurance  i 

 Tribal Well  i No