Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48861
Well Classification: OW Status: PR - 12/24/2021
Well Name/No:Becker #D17-725
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/24/2021
FacilityID:459447LocationID:459443
County:WELD #123Location:NWSE 5 3N64W 6
Field:WATTENBERG - #90750Elevation:4745 ft.
Planned Location:1815FSL  1314 FELLat/Long: 40.252180 / -104.570130Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2021
End Date: 11/19/2021
Reported: 12/15/2021
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/24/2021             Measured TD: 15019 ft.    Vertical TD: 6846 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/24/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/28/2024
Proposed Top PZ Location:Sec:8 Twp: 3N 64W Footage: 200 FNL  995 FEL
Bottom Hole Location:Sec:17 Twp: 3N 64W Footage: 2450 FNL  1000 FEL
Proposed Depth/Form:14943 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 960, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 663, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14943 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1644, Top: , Bottom: 14943 ft.

Wellbore Completed
Completion Date:10/27/2020
Spud Date:10/20/2020Spud Date Is:ACTUAL
Measured TD:15019 ft.Measured PB depth:14952 ft.
True Vertical TD:6846 ft.True Vertical PB depth:6847 ft.
Top PZ Location:Sec:8 Twp: 3N 64WFootage: 214 FNL  965 FEL
Bottom Hole Location:Sec:17 Twp: 3N 64WFootage: 2447 FNL  1028 FEL
Log Types:CBL, MWD/LWD, (IND in 123-22594)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 647, Top: 0 ft., Bottom: 1925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15000 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1759, Top: 2095 ft., Bottom: 15000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3785 ft.
SUSSEX4310 ft.
SHANNON4978 ft.
TEEPEE BUTTES6154 ft.
SHARON SPRINGS6930 ft.
NIOBRARA7011 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/24/2021                Interval Top: 7495 ft.    Interval Bottom: 14863 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/20/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/2/2021Treatment End Date:11/19/2021
Treatment Summary:Niobrara completed with 142 bbls 28% HCL, 417,097 bbls slurry, 1,168,932 lb 100 mesh, 11,458,489 lb 40/70.
Total fluid used in treatment (bbls):417239Max pressure during treatment (psi):8508
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):142Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):417097Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12627421Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7291 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/24/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1195
BBLS_OIL 55
BTU_GAS 1329
CALC_BBLS_H2O 1195
CALC_BBLS_OIL 55
CALC_GOR 5272
CALC_MCF_GAS 290
CASING_PRESS 3119
GRAVITY_OIL 42
MCF_GAS 290
TUBING_PRESS 1529
Perforation Data:
Interval Top:7495 ft.# Of Holes:976
Interval Bottom:14863 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)27477
Total Gas Produced (MCF)185965
GOR6768
GOR DeterminationBOE
Average BOE per Day163.318
Average MCFE per Day947.258

 Federal Financial Assurance  i 

 Tribal Well  i No