Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48855
Well Classification: OW Status: PR - 12/31/2021
Well Name/No:Becker #D17-715
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/31/2021
FacilityID:459439LocationID:459443
County:WELD #123Location:NESE 5 3N64W 6
Field:WATTENBERG - #90750Elevation:4745 ft.
Planned Location:1815FSL  1292 FELLat/Long: 40.252180 / -104.570050Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/2/2021
End Date: 11/19/2021
Reported: 12/15/2021
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/31/2021             Measured TD: 15100 ft.    Vertical TD: 6847 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/31/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/28/2024
Proposed Top PZ Location:Sec:8 Twp: 3N 64W Footage: 200 FNL  350 FEL
Bottom Hole Location:Sec:17 Twp: 3N 64W Footage: 2450 FNL  350 FEL
Proposed Depth/Form:15107 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 960, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 633, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15107 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1668, Top: , Bottom: 15107 ft.

Wellbore Completed
Completion Date:10/24/2020
Spud Date:10/20/2020Spud Date Is:ACTUAL
Measured TD:15100 ft.Measured PB depth:15043 ft.
True Vertical TD:6847 ft.True Vertical PB depth:6847 ft.
Top PZ Location:Sec:8 Twp: 3N 64WFootage: 218 FNL  351 FEL
Bottom Hole Location:Sec:17 Twp: 3N 64WFootage: 2449 FNL  327 FEL
Log Types:CBL, MWD/LWD, NEU (IND in 123-22594)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1927 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1927 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15091 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1770, Top: 1915 ft., Bottom: 15091 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3823 ft.
SUSSEX4310 ft.
SHANNON5055 ft.
TEEPEE BUTTES6255 ft.
SHARON SPRINGS7018 ft.
NIOBRARA7101 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/31/2021                Interval Top: 7583 ft.    Interval Bottom: 14953 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/22/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/2/2021Treatment End Date:11/19/2021
Treatment Summary:Niobrara completed with 130 bbls 28% HCL, 421,865 bbls slurry, 1,198,418 lb 100 mesh, 11,571,150 lb 40/70.
Total fluid used in treatment (bbls):421995Max pressure during treatment (psi):8178
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):130Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):421865Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12769568Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7383 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 775
BBLS_OIL 95
BTU_GAS 1322
CALC_BBLS_H2O 775
CALC_BBLS_OIL 95
CALC_GOR 3516
CALC_MCF_GAS 334
CASING_PRESS 3058
GRAVITY_OIL 42
MCF_GAS 334
TUBING_PRESS 1774
Perforation Data:
Interval Top:7583 ft.# Of Holes:984
Interval Bottom:14953 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)34380
Total Gas Produced (MCF)217449
GOR6324
GOR DeterminationBOE
Average BOE per Day196.858
Average MCFE per Day1141.775

 Federal Financial Assurance  i 

 Tribal Well  i No