Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48751
Well Classification: OW Status: PR - 7/28/2019
Well Name/No:Echeverria #2K-2H-D267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/28/2019
FacilityID:459175LocationID:459170
County:WELD #123Location:NWNW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Planned Location:897FNL  659 FWLLat/Long: 40.172030 / -104.864613Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.172030 / -104.864610Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/27/2019
End Date: 6/9/2019
Reported: 7/30/2019
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/28/2019             Measured TD: 12425 ft.    Vertical TD: 7270 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/28/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/20/2020
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 535 FNL  2456 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 460 FSL  2479 FWL
Proposed Depth/Form:12405 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2330 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 959, Top: 0 ft., Bottom: 2330 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12405 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1722, Top: , Bottom: 12405 ft.

Wellbore Completed
Completion Date:3/28/2019
Spud Date:1/24/2019Spud Date Is:ACTUAL
Measured TD:12425 ft.Measured PB depth:12399 ft.
True Vertical TD:7270 ft.True Vertical PB depth:7270 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 535 FNL  2456 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 460 S  2479 W
Log Types:MWD/LWD, Slim CBL, CBL (DIL in 123-20211, IND in 123-19854)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2361 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1068, Top: 0 ft., Bottom: 2361 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12412 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1665, Top: 1600 ft., Bottom: 12425 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4474 ft.NN
SHANNON5084 ft.NN
TEEPEE BUTTES6266 ft.NN
SHARON SPRINGS7440 ft.NN
NIOBRARA7561 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/28/2019                 Interval Top: 8067 ft.    Interval Bottom: 12390 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/29/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2019Treatment End Date:6/9/2019
Treatment Summary:172082 bbls of water, 200 bbls of additives (FRP-4CS, PetroChlor Activator, PetroChlor Catalyst, PetroChlor Precursor, Plexcide P5W, BHL-68, ACI-97, ASF-67, LGA-3J) and 12 bbl HCL in a 28 stage frac with 3886790 lbs of silica quartz proppant
Total fluid used in treatment (bbls):172294Max pressure during treatment (psi):8739
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2047
Fresh water used in treatment (bbls):172282Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3886790Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7626 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 303
BBLS_OIL 384
BTU_GAS 1326
CALC_BBLS_H2O 303
CALC_BBLS_OIL 384
CALC_GOR 3500
CALC_MCF_GAS 1344
CASING_PRESS 2167
GRAVITY_OIL 43
MCF_GAS 1344
TUBING_PRESS 1300
Perforation Data:
Interval Top:8067 ft.# Of Holes:644
Interval Bottom:12390 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2335
Total Gas Produced (MCF)78193
GOR33487
GOR DeterminationMCFE
Average BOE per Day43.247
Average MCFE per Day250.840

 Federal Financial Assurance  i 

 Tribal Well  i No