|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2024 Measured TD: 12247 ft. Vertical TD: 7248 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/20/2020 | Proposed Top PZ Location: | Sec:2 Twp: 2N 67W | Footage: 480 FNL 1826 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 67W | Footage: 401 FSL 1931 FWL | Proposed Depth/Form: | 12291 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2306 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 950, Top: 0 ft., Bottom: 2306 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12291 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1705, Top: , Bottom: 12291 ft. |
| | |
Wellbore Completed | Completion Date: | 4/8/2019 | Spud Date: | 1/27/2019 | Spud Date Is: | ACTUAL | Measured TD: | 12247 ft. | Measured PB depth: | 12220 ft. | True Vertical TD: | 7248 ft. | True Vertical PB depth: | 7248 ft. | Top PZ Location: | Sec:2 Twp: 2N 67W | Footage: 480 FNL 1826 FWL | Bottom Hole Location: | Sec:2 Twp: 2N 67W | Footage: 401 S 1931 W | Log Types: | MWD/LWD, Slim CBL, CBL (DIL in 123-20211, IND in 123-19854) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 44, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2339 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1049, Top: 0 ft., Bottom: 2339 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12234 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1674, Top: 2404 ft., Bottom: 12247 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4420 ft. | | N | N | SHANNON | 5006 ft. | | N | N | TEEPEE BUTTES | 6200 ft. | | N | N | SHARON SPRINGS | 7367 ft. | | N | N | NIOBRARA | 7515 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2024 Interval Top: 7866 ft. Interval Bottom: 12211 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/29/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/11/2019 | Treatment End Date: | 6/17/2019 | Treatment Summary: | 173410 bbls of water, 244 bbls of additives (FRP-4CS, PeroxyMAX, Plexcide P5W, ACI-97, ASF-68) and 6 bbl HCL in a 27 stage frac with 3936260 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 173660 | Max pressure during treatment (psi): | 8944 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1961 | Fresh water used in treatment (bbls): | 173654 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3936260 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7469 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/28/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 260 | BBLS_OIL | 357 | BTU_GAS | 1284 | CALC_BBLS_H2O | 260 | CALC_BBLS_OIL | 357 | CALC_GOR | 3000 | CALC_MCF_GAS | 1071 | CASING_PRESS | 2101 | GRAVITY_OIL | 43 | MCF_GAS | 1071 | TUBING_PRESS | 1200 |
| Perforation Data: | Interval Top: | 7866 ft. | # Of Holes: | 632 | Interval Bottom: | 12211 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 144 |
Total Gas Produced (MCF) | 2185 |
GOR | 15173 |
GOR Determination | MCFE |
Average BOE per Day | 1.420 |
Average MCFE per Day | 8.249 |
Federal Financial Assurance | i | |
|
|