Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48506
Well Classification: OW Status: PR - 7/25/2024
Well Name/No:Flaherty #13-2-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/25/2024
FacilityID:458777LocationID:443962
County:WELD #123Location:NWSW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4549 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2250FSL  160 FWLLat/Long: 40.311400 / -104.376040Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.311400 / -104.376040Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2024
End Date: 4/7/2024
Reported: 5/2/2024
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/25/2024             Measured TD: 11525 ft.    Vertical TD: 6275 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/25/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/26/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 795 FNL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 795 FNL  470 FWL
Proposed Depth/Form:11515 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N-R63W Sec 13: All
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11515 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1014, Top: , Bottom: 11515 ft.

Wellbore Completed
Completion Date:12/18/2022
Spud Date:11/21/2022Spud Date Is:ACTUAL
Measured TD:11525 ft.Measured PB depth:11498 ft.
True Vertical TD:6275 ft.True Vertical PB depth:6275 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 791 FNL  657 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 790 FNL  442 FWL
Log Types:Triple Combo on 05-123-42434. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1746 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 0 ft., Bottom: 1755 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11514 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1345, Top: 2852 ft., Bottom: 11525 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3546 ft.NN
SUSSEX4100 ft.NN
SHANNON4820 ft.NN
SHARON SPRINGS6679 ft.NN
NIOBRARA6753 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/25/2024                 Interval Top: 7290 ft.    Interval Bottom: 11450 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/25/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/3/2024Treatment End Date:4/7/2024
Treatment Summary:163325 bbls total; 5017899 # sand total(53940 200/mesh 564860 100/mesh 4399099 30/50); 23856 gals 15% HCL
Total fluid used in treatment (bbls):163325Max pressure during treatment (psi):9746
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):563Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1687
Fresh water used in treatment (bbls):162757Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5017899Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6680 ft.
Tubing Packer Depth:6688 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 475
BBLS_OIL 111
BTU_GAS 1405
CALC_BBLS_H2O 475
CALC_BBLS_OIL 111
CALC_GOR 315
CALC_MCF_GAS 35
GRAVITY_OIL 41
MCF_GAS 35
TUBING_PRESS 1003
Perforation Data:
Interval Top:7290 ft.# Of Holes:567
Interval Bottom:11450 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)26703
Total Gas Produced (MCF)79146
GOR2963
GOR DeterminationBOE
Average BOE per Day110.803
Average MCFE per Day642.655

 Federal Financial Assurance  i 

 Tribal Well  i No