|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/24/2021 Measured TD: 19599 ft. Vertical TD: 7305 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/24/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/18/2020 | | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1373 FSL 2502 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 2193 FSL 2469 FWL | | Proposed Depth/Form: | 19557 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED | | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2170 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 841, Top: 0 ft., Bottom: 2170 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19557 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2808, Top: , Bottom: 19557 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/29/2020 | | Spud Date: | 8/23/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 19599 ft. | Measured PB depth: | 19570 ft. | | True Vertical TD: | 7305 ft. | True Vertical PB depth: | 7305 ft. | | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1373 FSL 2502 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 68W | Footage: 2193 FSL 2469 FWL | | Log Types: | MWD/LWD (IND in API 123-20125) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2236 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 888, Top: 0 ft., Bottom: 2236 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19584 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2478, Top: 1872 ft., Bottom: 19599 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4285 ft. | | N | N | | SHANNON | 4906 ft. | | N | N | | SHARON SPRINGS | 7325 ft. | | N | N | | NIOBRARA | 7483 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 3/24/2021 Interval Top: 8160 ft. Interval Bottom: 19587 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/5/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/30/2020 | Treatment End Date: | 1/29/2021 | | Treatment Summary: | 453457 bbls of water, 215 bbls of additives (FRP-22G, Bardac 2250M, Dixichlor Max, Plexcide P5W, T-Chlor 12.5, SAFE-BFH-2, XLS-3Z, BHL-68W, BHL-68W-2, ACI-97, ASF-67) and 36 bbl HCL in a 56 stage frac with 35,141 lbs of DFR-1X, 14741 lbs of PGA-4045, and 7384260 lbs of silica quartz proppant. Oil and water are metered from flowback equipment. The daily water volumes are periodically checked against trucked volumes. All meters are calibrated before use on every pad.
| | Total fluid used in treatment (bbls): | 454085 | Max pressure during treatment (psi): | 9038 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 56 | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.92 | | Recycled water used in treatment (bbls): | 377 | Total flowback volume recovered (bbls): | 16293 | | Fresh water used in treatment (bbls): | 453672 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 7384260 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7460 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 281 | | BBLS_OIL | 375 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 281 | | CALC_BBLS_OIL | 375 | | CALC_GOR | 1317 | | CALC_MCF_GAS | 494 | | CASING_PRESS | 2600 | | GRAVITY_OIL | 50 | | MCF_GAS | 494 | | TUBING_PRESS | 1575 |
| | Perforation Data: | | Interval Top: | 8160 ft. | # Of Holes: | 1354 | | Interval Bottom: | 19587 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 11169 |
| Total Gas Produced (MCF) | 268745 |
| GOR | 24061 |
| GOR Determination | MCFE |
| Average BOE per Day | 157.814 |
| Average MCFE per Day | 915.321 |
| Federal Financial Assurance | i | |
|
|