Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48255
Well Classification: OW Status: PR - 10/17/2019
Well Name/No:Coyote Trails #33W-15-6C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2019
FacilityID:458193LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Planned Location:1230FSL  2381 FELLat/Long: 40.018198 / -105.007569Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018198 / -105.007568Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2019
End Date: 9/9/2019
Reported: 9/26/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/17/2019             Measured TD: 16174 ft.    Vertical TD: 8154 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/17/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Prop Depth/Form:16297 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: 407-3177 , Unit Acreage: 700, Drill Unit: 1N68W S32 N2, N2N2S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16297 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2156, Top: , Bottom: 16297 ft.

Wellbore Completed
Completion Date:4/8/2019
Spud Date:3/25/2019Spud Date Is:ACTUAL
Measured TD:16174 ft.Measured PB depth:16142 ft.
True Vertical TD:8154 ft.True Vertical PB depth:8154 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 1599 FNL  2420 FELDepth
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 1615 FNL  513 FWLDepth
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1629 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1629 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16154 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2700, Top: 200 ft., Bottom: 16174 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4971 ft.NN
SUSSEX5316 ft.NN
SHANNON6028 ft.NN
SHARON SPRINGS8314 ft.NN
NIOBRARA8353 ft.NN
FORT HAYS9144 ft.NN
CODELL9683 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/15/2019                Interval Top: 9687 ft.    Interval Bottom: 16142 ft.

 Completed Information for Formation CODELL
1st Production Date:10/7/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 9687'-14865'; 15144'-16142'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9687 ft.# Of Holes:718
Interval Bottom:16142 ft.Hole Size:0.4 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/15/2019                Interval Top: 9172 ft.    Interval Bottom: 14989 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/7/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 9172'-9649'; 14889'-14989'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9172 ft.# Of Holes:75
Interval Bottom:14989 ft.Hole Size:0.4 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 10/17/2019                Interval Top: 8399 ft.    Interval Bottom: 16142 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:10/7/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell with 31-stage plug-and-perf; 107556 total bbls fluid pumped: 99495 bbls gelled fluid and 8061 bbls fresh water; 5812495 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):107556Max pressure during treatment (psi):8720
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8991
Fresh water used in treatment (bbls):8061Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5812495Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8385 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 269
BBLS_OIL 230
BTU_GAS 1300
CALC_BBLS_H2O 269
CALC_BBLS_OIL 230
CALC_GOR 7161
CALC_MCF_GAS 1647
CASING_PRESS 2719
GRAVITY_OIL 49
MCF_GAS 1647
TUBING_PRESS 1881
Perforation Data:
Interval Top:8399 ft.# Of Holes:898
Interval Bottom:16142 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/15/2019                Interval Top: 8399 ft.    Interval Bottom: 15123 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/7/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 8399'-9137'; 15012'-15123'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8399 ft.# Of Holes:105
Interval Bottom:15123 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)6986
Total Gas Produced (MCF)116132
GOR16623
GOR DeterminationMCFE
Average BOE per Day73.702
Average MCFE per Day427.464

 Federal Financial Assurance  i 

 Tribal Well  i No