Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48250
Well Classification: OW Status: PR - 10/17/2019
Well Name/No:Coyote Trails #33W-15-8N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2019
FacilityID:458188LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1230FSL  2363 FELLat/Long: 40.018197 / -105.007504Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018197 / -105.007506Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2019
End Date: 9/11/2019
Reported: 9/26/2019
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/17/2019             Measured TD: 16305 ft.    Vertical TD: 8025 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/17/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 2032 FNL  2406 FEL
Bottom Hole Location:Sec:32 Twp: 1N 68W Footage: 2175 FNL  499 FWL
Proposed Depth/Form:16337 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3177 , Unit Acreage: 700, Drill Unit: 1N68W S32 N2, N2N2S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: , Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16337 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2162, Top: , Bottom: 16337 ft.

Wellbore Completed
Completion Date:4/3/2019
Spud Date:3/24/2019Spud Date Is:ACTUAL
Measured TD:16305 ft.Measured PB depth:16288 ft.
True Vertical TD:8025 ft.True Vertical PB depth:8024 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 2032 FNL  2406 FEL
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 2175 FNL  499 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1624 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1624 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.2 in., Top: 0 ft., Depth: 16296 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2600, Top: 1520 ft., Bottom: 16305 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4925 ft.NN
SUSSEX5258 ft.NN
SHANNON5967 ft.NN
SHARON SPRINGS8376 ft.NN
NIOBRARA8459 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/17/2019                Interval Top: 8506 ft.    Interval Bottom: 16288 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/7/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/11/2019
Treatment Summary:Frac'd Niobrara with 39-stage plug-and-perf; 179802 total bbls fluid pumped: 167532 bbls gelled fluid and 12270 bbls fresh water; 7802915 total lbs proppant pumped: 3901345 lbs 40/70 mesh and 3901570 lbs 30/50 mesh.
Total fluid used in treatment (bbls):179802Max pressure during treatment (psi):8459
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12220
Fresh water used in treatment (bbls):12270Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7802915Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8485 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 290
BBLS_OIL 187
BTU_GAS 1300
CALC_BBLS_H2O 290
CALC_BBLS_OIL 187
CALC_GOR 5925
CALC_MCF_GAS 1108
CASING_PRESS 2817
GRAVITY_OIL 49
MCF_GAS 1108
TUBING_PRESS 1876
Perforation Data:
Interval Top:8506 ft.# Of Holes:913
Interval Bottom:16288 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4656
Total Gas Produced (MCF)79062
GOR16980
GOR DeterminationMCFE
Average BOE per Day50.106
Average MCFE per Day290.621

 Federal Financial Assurance  i 

 Tribal Well  i No