Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48250
Well Classification: OW Status: PR - 10/17/2019
Well Name/No:Coyote Trails #33W-15-8N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2019
FacilityID:458188LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Planned Location:1230FSL  2363 FELLat/Long: 40.018197 / -105.007504Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018197 / -105.007506Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2019
End Date: 9/11/2019
Reported: 9/26/2019
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/17/2019             Measured TD: 16305 ft.    Vertical TD: 8025 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/17/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Prop Depth/Form:16337 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3177 , Unit Acreage: 700, Drill Unit: 1N68W S32 N2, N2N2S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: , Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16337 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2162, Top: , Bottom: 16337 ft.

Wellbore Completed
Completion Date:4/3/2019
Spud Date:3/24/2019Spud Date Is:ACTUAL
Measured TD:16305 ft.Measured PB depth:16288 ft.
True Vertical TD:8025 ft.True Vertical PB depth:8024 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 2032 FNL  2406 FELDepth
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 2175 FNL  499 FWLDepth
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1624 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1624 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.2 in., Top: 0 ft., Depth: 16296 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2600, Top: 1520 ft., Bottom: 16305 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4925 ft.NN
SUSSEX5258 ft.NN
SHANNON5967 ft.NN
SHARON SPRINGS8376 ft.NN
NIOBRARA8459 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/17/2019                Interval Top: 8506 ft.    Interval Bottom: 16288 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/7/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/11/2019
Treatment Summary:Frac'd Niobrara with 39-stage plug-and-perf; 179802 total bbls fluid pumped: 167532 bbls gelled fluid and 12270 bbls fresh water; 7802915 total lbs proppant pumped: 3901345 lbs 40/70 mesh and 3901570 lbs 30/50 mesh.
Total fluid used in treatment (bbls):179802Max pressure during treatment (psi):8459
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12220
Fresh water used in treatment (bbls):12270Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7802915Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8485 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 290
BBLS_OIL 187
BTU_GAS 1300
CALC_BBLS_H2O 290
CALC_BBLS_OIL 187
CALC_GOR 5925
CALC_MCF_GAS 1108
CASING_PRESS 2817
GRAVITY_OIL 49
MCF_GAS 1108
TUBING_PRESS 1876
Perforation Data:
Interval Top:8506 ft.# Of Holes:913
Interval Bottom:16288 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)6064
Total Gas Produced (MCF)111678
GOR18416
GOR DeterminationMCFE
Average BOE per Day69.223
Average MCFE per Day401.475

 Federal Financial Assurance  i 

 Tribal Well  i No