Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48248
Well Classification: OW Status: PR - 10/28/2019
Well Name/No:Coyote Trails #33W-15-7N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/28/2019
FacilityID:458186LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5274 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1150FSL  2373 FELLat/Long: 40.017978 / -105.007538Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017979 / -105.007537Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/24/2019
End Date: 8/31/2019
Reported: 9/26/2019
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/28/2019             Measured TD: 16195 ft.    Vertical TD: 7950 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/28/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 1954 FNL  2552 FEL
Bottom Hole Location:Sec:32 Twp: 1N 68W Footage: 1900 FNL  511 FWL
Proposed Depth/Form:16172 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3177 , Unit Acreage: 700, Drill Unit: 1N68W S32 N2, N2N2S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16172 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2138, Top: , Bottom: 16172 ft.

Wellbore Completed
Completion Date:7/10/2019
Spud Date:5/4/2019Spud Date Is:ACTUAL
Measured TD:16195 ft.Measured PB depth:16172 ft.
True Vertical TD:7950 ft.True Vertical PB depth:7949 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 1954 FNL  2552 FEL
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 1900 FNL  511 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1613 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1613 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16177 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2600, Top: 1500 ft., Bottom: 16195 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5027 ft.NN
SUSSEX5423 ft.NN
SHANNON6048 ft.NN
SHARON SPRINGS8548 ft.NN
NIOBRARA8599 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/28/2019                Interval Top: 8644 ft.    Interval Bottom: 16164 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/24/2019Treatment End Date:8/31/2019
Treatment Summary:Frac'd Niobrara with 38-stage plug-and-perf; 177150 total bbls fluid pumped: 165991 bbls gelled fluid and 11159 bbls fresh water; 7600000 total lbs proppant pumped: 3800000 lbs 40/70 mesh and 3800000 lbs 30/50 mesh.
Total fluid used in treatment (bbls):177150Max pressure during treatment (psi):8596
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6335
Fresh water used in treatment (bbls):11159Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7600000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8626 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 591
BBLS_OIL 212
BTU_GAS 1300
CALC_BBLS_H2O 591
CALC_BBLS_OIL 212
CALC_GOR 3071
CALC_MCF_GAS 651
CASING_PRESS 2396
GRAVITY_OIL 49
MCF_GAS 651
TUBING_PRESS 1668
Perforation Data:
Interval Top:8644 ft.# Of Holes:889
Interval Bottom:16164 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4258
Total Gas Produced (MCF)93876
GOR22046
GOR DeterminationMCFE
Average BOE per Day55.988
Average MCFE per Day324.709

 Federal Financial Assurance  i 

 Tribal Well  i No