Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48035
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:Hunt 8-60 #17A-20-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CIVITAS NORTH LLC - 10661
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2024
FacilityID:457649LocationID:457131
County:WELD #123Location:SWNW 17 8N60W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4942 ft.
Planned Location:2363FNL  431 FWLLat/Long: 40.663044 / -104.123228Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.663044 / -104.123227Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/14/2018
End Date: 12/21/2018
Reported: 1/30/2019
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 13827 ft.    Vertical TD: 6357 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/26/2020
Prop Depth/Form:14171 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1091 , Unit Acreage: 960, Drill Unit: 20: ALL, 17: S/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14171 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1860, Top: 4000 ft., Bottom: 14171 ft.

Wellbore Completed
Completion Date:11/21/2018
Spud Date:10/12/2018Spud Date Is:ACTUAL
Measured TD:13827 ft.Measured PB depth:13771 ft.
True Vertical TD:6357 ft.True Vertical PB depth:6360 ft.
Top PZ Location:Sec:17 Twp: 8N 60WFootage: 2003 FSL  1070 FWLDepth
Bottom Hole Location:Sec:20 Twp: 8N 60WFootage: 229 FSL  1120 FWLDepth
Log Types:MWD/LWD, CBL, (DIL in API: 123-47779)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1923 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 677, Top: 0 ft., Bottom: 1923 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13817 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1920, Top: 170 ft., Bottom: 13827 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3444 ft.
SUSSEX4282 ft.
SHARON SPRINGS6305 ft.
NIOBRARA6427 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 6755 ft.    Interval Bottom: 13727 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/21/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2018Treatment End Date:12/21/2018
Treatment Summary:47 stage perf & pluf completion- 13727'-6755': 232232 total bbls fluid: 231649 bbls fresh water (slurry) & 583 bbls HCl 15213121 lbs total proppant (40/70 sand)
Total fluid used in treatment (bbls):232232Max pressure during treatment (psi):8556
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):583Min frac gradient (psi/ft):0.77
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):32803
Fresh water used in treatment (bbls):231649Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15213121Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6453 ft.
Tubing Packer Depth:6447 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/22/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 423
BBLS_OIL 553
BTU_GAS 1451
CALC_BBLS_H2O 423
CALC_BBLS_OIL 553
CALC_GOR 593
CALC_MCF_GAS 328
GRAVITY_OIL 37
MCF_GAS 328
TUBING_PRESS 174
Perforation Data:
Interval Top:6755 ft.# Of Holes:1106
Interval Bottom:13727 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No