|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2021 Measured TD: 16711 ft. Vertical TD: 6482 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/20/2020 | | Proposed Top PZ Location: | Sec:4 Twp: 4N 63W | Footage: 533 FNL 29 FEL | | Bottom Hole Location: | Sec:9 Twp: 4N 63W | Footage: 402 FSL 225 FEL | | Proposed Depth/Form: | 16559 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 743, Top: 0 ft., Bottom: 1600 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16559 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2689, Top: , Bottom: 16559 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/14/2018 | | Spud Date: | 10/1/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 16711 ft. | Measured PB depth: | 16656 ft. | | True Vertical TD: | 6482 ft. | True Vertical PB depth: | 6482 ft. | | Top PZ Location: | Sec:4 Twp: 4N 63W | Footage: 533 FNL 29 FEL | | Bottom Hole Location: | Sec:9 Twp: 4N 63W | Footage: 402 FSL 225 FEL | | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-32983). | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1603 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 766, Top: 0 ft., Bottom: 1603 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16701 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2639, Top: 1325 ft., Bottom: 16701 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3313 ft. | | | | | SHARON SPRINGS | 6155 ft. | | | | | NIOBRARA | 6319 ft. | | | | | FORT HAYS | 6715 ft. | | | | | CODELL | 6804 ft. | | | | | CARLILE | 8372 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 5/27/2020 Interval Top: 16001 ft. Interval Bottom: 16115 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 8/14/2019 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/26/2019 | Treatment End Date: | 7/6/2019 | | Treatment Summary: | Perforated Intervals: 16001'-16115'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 16001 ft. | # Of Holes: | 27 | | Interval Bottom: | 16115 ft. | Hole Size: | 0.41 in. |
|
Formation CARL Formation Classification: OW Status: CM - 5/27/2020 Interval Top: 8379 ft. Interval Bottom: 13112 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 8/14/2019 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/26/2019 | Treatment End Date: | 7/6/2019 | | Treatment Summary: | Perforated Intervals: 8379'-9680'; 10612'-10824'; 12452'-13112'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8379 ft. | # Of Holes: | 357 | | Interval Bottom: | 13112 ft. | Hole Size: | 0.41 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 6935 ft. Interval Bottom: 16570 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 8/14/2019 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/26/2019 | Treatment End Date: | 7/6/2019 | | Treatment Summary: | 71-stage plug-and-perf completion:
485437 total bbls fluid pumped: 485425 bbls fresh water (slurry) and 12 bbls 15% HCl acid;
19932413 total lbs proppant pumped: 19202503 lbs 40/70 Ottawa sand and 729910 lbs of 100 Mesh. | | Total fluid used in treatment (bbls): | 485437 | Max pressure during treatment (psi): | 7985 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 71 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 20031 | | Fresh water used in treatment (bbls): | 485425 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 19932413 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6397 ft. | | Tubing Packer Depth: | 6387 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 209 | | BBLS_OIL | 351 | | BTU_GAS | 1310 | | CALC_BBLS_H2O | 209 | | CALC_BBLS_OIL | 351 | | CALC_GOR | 649 | | CALC_MCF_GAS | 228 | | CASING_PRESS | 642 | | GRAVITY_OIL | 46 | | MCF_GAS | 228 | | TUBING_PRESS | 1100 |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 1917 | | Interval Bottom: | 16570 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/27/2020 Interval Top: 6935 ft. Interval Bottom: 16570 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/14/2019 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/26/2019 | Treatment End Date: | 7/6/2019 | | Treatment Summary: | Perforated Intervals: 6935'-8365'; 9695'-10595'; 10839'-12440'; 13127'-15987'; 16130'-16570'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 1533 | | Interval Bottom: | 16570 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 10719 |
| Total Gas Produced (MCF) | 20813 |
| GOR | 1941 |
| GOR Determination | BOE |
| Average BOE per Day | 39.155 |
| Average MCFE per Day | 227.073 |
| Federal Financial Assurance | i | |
|
|