Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47956
Well Classification: OW Status: PR - 1/1/2021
Well Name/No:Park #U-4-9XRLC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:457523LocationID:421630
County:WELD #123Location:NENE 4 4N63W 6
Field:WATTENBERG - #90750Elevation:4534 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:456FNL  277 FELLat/Long: 40.347464 / -104.434250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.347465 / -104.434247Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/26/2019
End Date: 7/6/2019
Reported: 1/6/2020
Originally Reported: 8/1/2019
Days to report: 184
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2021             Measured TD: 16711 ft.    Vertical TD: 6482 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/20/2020
Proposed Top PZ Location:Sec:4 Twp: 4N 63W Footage: 533 FNL  29 FEL
Bottom Hole Location:Sec:9 Twp: 4N 63W Footage: 402 FSL  225 FEL
Proposed Depth/Form:16559 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 743, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16559 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2689, Top: , Bottom: 16559 ft.

Wellbore Completed
Completion Date:10/14/2018
Spud Date:10/1/2018Spud Date Is:ACTUAL
Measured TD:16711 ft.Measured PB depth:16656 ft.
True Vertical TD:6482 ft.True Vertical PB depth:6482 ft.
Top PZ Location:Sec:4 Twp: 4N 63WFootage: 533 FNL  29 FEL
Bottom Hole Location:Sec:9 Twp: 4N 63WFootage: 402 FSL  225 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-32983).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1603 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1603 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16701 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2639, Top: 1325 ft., Bottom: 16701 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3313 ft.
SHARON SPRINGS6155 ft.
NIOBRARA6319 ft.
FORT HAYS6715 ft.
CODELL6804 ft.
CARLILE8372 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/27/2020                 Interval Top: 16001 ft.    Interval Bottom: 16115 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/14/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/26/2019Treatment End Date:7/6/2019
Treatment Summary:Perforated Intervals: 16001'-16115'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:16001 ft.# Of Holes:27
Interval Bottom:16115 ft.Hole Size:0.41 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/27/2020                 Interval Top: 8379 ft.    Interval Bottom: 13112 ft.

 Completed Information for Formation CARLILE
1st Production Date:8/14/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/26/2019Treatment End Date:7/6/2019
Treatment Summary:Perforated Intervals: 8379'-9680'; 10612'-10824'; 12452'-13112'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8379 ft.# Of Holes:357
Interval Bottom:13112 ft.Hole Size:0.41 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/1/2025                  Interval Top: 6935 ft.    Interval Bottom: 16570 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/14/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/26/2019Treatment End Date:7/6/2019
Treatment Summary:71-stage plug-and-perf completion: 485437 total bbls fluid pumped: 485425 bbls fresh water (slurry) and 12 bbls 15% HCl acid; 19932413 total lbs proppant pumped: 19202503 lbs 40/70 Ottawa sand and 729910 lbs of 100 Mesh.
Total fluid used in treatment (bbls):485437Max pressure during treatment (psi):7985
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:71
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20031
Fresh water used in treatment (bbls):485425Disposition method For flowback:DISPOSAL
Total proppant used (lbs):19932413Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6397 ft.
Tubing Packer Depth:6387 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 209
BBLS_OIL 351
BTU_GAS 1310
CALC_BBLS_H2O 209
CALC_BBLS_OIL 351
CALC_GOR 649
CALC_MCF_GAS 228
CASING_PRESS 642
GRAVITY_OIL 46
MCF_GAS 228
TUBING_PRESS 1100
Perforation Data:
Interval Top:6935 ft.# Of Holes:1917
Interval Bottom:16570 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/27/2020                 Interval Top: 6935 ft.    Interval Bottom: 16570 ft.

 Completed Information for Formation CODELL
1st Production Date:8/14/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/26/2019Treatment End Date:7/6/2019
Treatment Summary:Perforated Intervals: 6935'-8365'; 9695'-10595'; 10839'-12440'; 13127'-15987'; 16130'-16570'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6935 ft.# Of Holes:1533
Interval Bottom:16570 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)10719
Total Gas Produced (MCF)20813
GOR1941
GOR DeterminationBOE
Average BOE per Day39.155
Average MCFE per Day227.073

 Federal Financial Assurance  i 

 Tribal Well  i No